Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 13, 2023 at 7:00 PM
Updated January 29, 2024
Demolition and site work for a mixed-use development in Murfreesboro, Tennessee. Completed plans call for site work for a educational facility; and for the demolition of a educational facility.
Playground Replacement at Mitchell-Neilson Elementary School. Bids received after the above time and date will be rejected. Question Deadline 12/05/2023 at 10:00 AM CT The school site is available to bidders for observations on weekends and on weekdays after 6:00 PM. If job site access is required at other times, the job site can be made available by contacting Larry Willeford at 615-482-3957. SCOPE OF WORK A. Work under this Contract includes, but is not limited to, the following: 1. Demolition of existing playground equipment and restoration of area to lawn. 2. Construction of new playg rounds consisting of grading, construction of new play structures, fencing, and concrete walks. 3. Install a 4 foot high plastic barrier fence around the work area of the new playground. This is to be an area not less than the limits of disturbance. Fence is to remain in place during the course of construction. 3. Repair any existing construction damaged during the course of the work, including landscaping, lawn, and sidewalks to preconstruction condition. Demolition of existing playground equipment at north end of site is not to begin until construction of the new playground is complete and ready for use. This includes obtaining independent audit and completing corrections noted in the independent audit. Whereas the Owner will suffer loss of use if the project is not complete on or before Eighty One (81) consecutive calendar days after Notice to Proceed is issued, the Contractor and their Surety shall be liable for and shall pay to the Owner the sum of Three Hundred Dollars ($300.00) as fixed and agreed liquidated damages for each calendar day of delay (in excess of the Contract Completion Date established herein) until the work is substantially complete as defined in AIA Document A201, Subparagraph 9.8.1. Architect shall issue a Certificate of Substantial Completion (AIA Document G704) to verify date work is substantially complete. Bids Open. Dial by your location Meeting ID: 896 7634 0264 Find your local number: https://us02web.zoom.us/u/kbsmhArTZD Each Proposal shall be accompanied by a bid security in the amount of 5% of the bid. The security is required as a guarantee that, if the bid is accepted, a contract will be entered into. A performance bond and a labor and material payment bond in the amount of 100% of contract sum, issued by a bonding company licensed in the State of Tennessee and acceptable to Owner. Murfreesboro City Schools is accepting sealed bids for Playground Replacement at Mitchell-Neilson Elementary School. Whereas the Owner will suffer loss of use if the project is not complete on or before Eighty One (81) consecutive calendar days after Notice to Proceed is issued, the Contractor and their Surety shall be liable for and shall pay to the Owner the sum of Three Hundred Dollars ($300.00) as fixed and agreed liquidated damages for each calendar day of delay (in excess of the Contract Completion Date established herein) until the work is substantially complete as defined in AIA Document A201, Subparagraph 9.8.1. Architect shall issue a Certificate of Substantial Completion (AIA Document G704) to verify date work is substantially complete. The school site is available to bidders for observations on weekends and on weekdays after 6:00 PM. If job site access is required at other times, the job site can be made available by contacting Larry Willeford at 615-482-3957.
Award
Educational
$571,300.00
Public - City
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 12, 2023
January 15, 2024
711 W Clark Blvd, Murfreesboro, TN
Related To This Project
Murfreesboro, TN
Bid Date: Dec 13 2023
Murfreesboro, TN
Bid Date: Jan 11 2024
Murfreesboro, TN
Bid Date: Dec 12 2023
Murfreesboro, TN
Bid Date: Dec 21 2023
Murfreesboro, TN
Bid Date: Dec 19 2023
Murfreesboro, TN
Bid Date: Dec 14 2023
Murfreesboro, TN
Bid Date: Jan 08 2024
Murfreesboro, TN
Bid Date: Jan 03 2024
Murfreesboro, TN
--
Murfreesboro, TN
Bid Date: Dec 07 2023
Murfreesboro, TN
Bid Date: Dec 04 2023
Murfreesboro, TN
--
Murfreesboro, TN
--
Murfreesboro, TN
--
Murfreesboro, TN
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
