BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Newton, North Carolina. Design plans call for the construction of a municipal facility; and for site work for a municipal facility.

This project is in included in the Catawba County FY 2025 Budget. As of August 29, 2024, this project is in the design phase. Construction is expected in FY 26/27. The firm will provide professional engineering services in the areas of design, permitting, formal project bidding, bid award recommendation, contract administration, construction inspection, Construction Quality Assurance (CQA), and record drawings of a Subtitle D Municipal Sanitary and fill (Unit 4) to be constructed at the Blackburn Resource Recovery Facility. The firm will submit along with the RFQ, the name, address and contact information for the lead person to be associated with the project. The major items of work will include, but not be limited to: 1. The preparation of detailed drawings, specifications and contract documents necessary for the bidding, permitting, and construction of the proposed project and the prequalification of prospective contractors. The project will construct a new Municipal Solid Waste Subtitle D Landfill Cell, designated as MSW Unit 4. 2. The furnishing of such documents and design data as may be required to obtain approvals and permits of all state, federal and local agencies as may have jurisdiction over the design and construction of this project, or any part thereof. 3. Coordinate design and construction work with any approved contractor(s) and project owner. 4. Attend bid openings, tabulate bids, analyze bids and provide recommendation to the County concerning award of the construction contract. 5. Prepare the agenda and conduct the pre-bid conference and minutes thereof. 6. Prepare the agenda and conduct the preconstruction conference and subsequent progress meetings and minutes thereof. Once the submittals have been reviewed, the County reserves the right to shortlist Firm(s) and request that the Firm(s) conduct a presentation and be interviewed by the selection committee. Catawba County reserves the right to reject any and all submittals. This submittal request is neither a contractual offer nor a commitment to purchase services. The County assumes no contractual obligation as a result of the issuance of this request, the preparation or submission of a qualifications statement by a Firm, the evaluation of statements or final selection.

Design

Municipal

$13,000,000.00

Public - County

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
76
Bidding Soon
1,180
All Active Projects
493
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

img_map_placeholder

Multiple Locations, Newton, NC


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.