BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and renovation of a mixed-use development in Greenland, New Hampshire. Completed plans call for the demolition of a one-unit multi-residential development; for site work for a multi-residential development; one-unit parking garage; parking garage; three-unit residential development; residential development; for the renovation of a multi-residential development; and residential development.

County: Rockingham Work of the project includes demolition of five (5) structures (one (1) garage, two (2) single family cottage dwellings, one (1) apartment building, and one (1) barn); renovation of a historic farmhouse; construction of an open air picnic pavilion with enclosed accessory spaces; and construction of a three-bay garage. The demolition of the structures includes, but is not limited to, removing the buildings in their entirety, including foundations, and the cutting and capping, or removal back to the source, of utilities. The renovation of the farmhouse includes but is not limited to: removal and replacement of exterior siding and insulation, windows, roofing, and wood deck; alteration of interior walls; upgrading mechanical and electrical systems; the provision of a sprinkler system; and finish replacement/upgrades. Add Alternate #1 is to relocate the cottage. The relocation of the cottage includes, but is not limited to, moving the existing single-story structure across the site to a new foundation and the subsequent demolition of the existing foundation. The Project will include the Discipline(s) of: Site Construction, Concrete, Wood and Plastics, Thermal and Moisture Protection, Doors and Windows, Finishes, Mechanical, Electrical. Bidders Should Act Promptly and Submit All Questions in Writing to Jonathan Fudala, Fax 603/271-3515, E-mail Jonathan.a.fudala@das.nh.gov in Accordance With Explanation to Bidders - Instructions to Bidders, Document 00204 - Part 13 Project completion date is 2/28/2025 NH DOT - Glenn Cove Improvements

Bid Results

Multi-Residential

$3,237,450.00

Public - State/Provincial

Demolition, Renovation, Site Work

132

28

7

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
164
Bidding Soon
2,109
All Active Projects
949
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2023

February 19, 2024

img_map_placeholder

53 Emery Ln, Greenland, NH

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.