BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2024 at 7:00 PM

Updated March 22, 2024

Renovation of a transportation facility in Worcester, Massachusetts. Completed plans call for the renovation of a transportation facility.

Estimated Cost $2,050,000.00. Worcester Regional Airport Terminal Security - Checkpoint Improvements - Sub. Chapter 149 Construction, Worcester Regional Airport Terminal Security Checkpoint Improvements. Renovation of Interior Space and Relocation of Two Existing Security Checkpoint Lanes . Provide New Hvac System for the Space. Demolition of the Existing Roof Top Unit (Rtu) and Replacing With a New Rtu System. HVAC, Damp-Proofing, Caulking, Painting, Glass & Glazing, Acoustical Ceiling, Electrical, Roofing and Flashing, Tile. The work includes: RENOVATION OF AN INTERIOR SPACE AND RELOCATION OF TWO EXISTING SECURITY CHECKPOINT LANES. DEMOLITION OF AN EXISTING ROOF TOP UNIT (RTU) AND INSTALLATION OF A NEW RTU WITH ASSOCIATED DUCTWORK. ELECTRICAL AND STRUCTURAL MODIFICATIONS This contract is subject to a Minority/Women Owned Business Enterprise participation provision requiring that not less than THREE POINT THREE PERCENT (3.3%) of the Contract be performed by minority and women owned business enterprise contractors. Any inquires by bidders as to interpretations of the Drawings, Specifications, Special Provisions, or other Contract Documents must be submitted to CPBidQuestions@massport.com with the MPA Project Number referenced in the subject line, not later than seven (7) days before the advertised date for submission. The Work to be performed under this Contract includes: a. Selective demolition of interior walls, column enclosures, and other finishes. b. Slab preparation. c. Installation of floor finishes. d. Remove ceiling tile for installation of conduit and reinstall. e. Modifications to existing walls. f. Wall preparation and painting. g. Electrical power for relocated security lane equipment. h. Installation of lighting and associated wiring. i. Airport Operations shall not be interrupted by construction activities. j. HVAC improvements including the removal and disposal of an existing roof top unit (RTU) k. Installation of a new RTU and associated ductwork. l. Structural modifications for the support of the new RTU. m. Installation of new and modification of existing roofing, including moving, storing, and reinstalling concrete pavers. n. Modifications to existing fire protection systems. o. Phased relocation of security lane equipment

Bid Results

Transportation Terminals

$28,239.00

Public - State/Provincial

Renovation

46

104

10

7

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
641
Active Projects
231
Bidding Soon
4,807
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2024

February 1, 2024

Project location map

375 Airport Dr, Worcester, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.