Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.
Florence Nightingale Elementary School - Boiler #2 Tubing The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. Warranty information, when applicable, shall also be included & submitted. All work to be performed during normal working hours. If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid. - Cut the complete set of tubes from the boiler and remove them from the premises. - Assess the condition of the tube sheet once all the tubes have been removed. - If there are any issues with the tube sheets, notify CPS immediately. - Prepare the tube sheets by removing sharp edges and burrs. - Flush out the shell of all scale and debris. - Transfer scrap out and new tubes into the building. - Set in the boiler a complete set of 2" SA-178A boiler tubes. - New tubes to be properly flare rolled front and rear of the tube sheets. - Replace hand holes and cover plates removed to perform this work. - Fill the boiler and apply a hydrostatic test below the set pressure of the safety valve. - Leave the area free of debris caused by work. - Close the Boiler. CPS Specifications: - Contractor to secure necessary permits. - Contractor to field verify dimensions and specifics of all projects listed above before placing bid. - Not responsible for contractor errors as a result of non-field verification. - Materials and installation must comply with CPS Standards and Specifications as listed on a) STEAM AND HOT WATER BOILER RENOVATION - Section 23 01 51 b) WATER-TUBE BOILERS - Section 23 52 33 c) FIRE-TUBE AND FIRE-BOX BOILERS - Section 23 52 39 - Secure job site overnight if work is not completed in one day. - If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. - Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. - All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. - Contractor is to remove and dispose of materials torn out and any construction debris. - All trash must be removed off-site by contractor. - Clean the surrounding area and make sure all is swept of debris. - All questions/requests must be received two (2) business days prior to bid closing
Bid Results
Educational
$49,378.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2023
January 18, 2024
5225 S Talman Ave, Chicago, IL
Related To This Project
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Jan 17 2024
Chicago, IL
Bid Date: Jan 08 2024
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Dec 19 2023
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Dec 01 2023
Chicago, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.