BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Florence Nightingale Elementary School - Boiler #2 Tubing The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. Warranty information, when applicable, shall also be included & submitted. All work to be performed during normal working hours. If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid. - Cut the complete set of tubes from the boiler and remove them from the premises. - Assess the condition of the tube sheet once all the tubes have been removed. - If there are any issues with the tube sheets, notify CPS immediately. - Prepare the tube sheets by removing sharp edges and burrs. - Flush out the shell of all scale and debris. - Transfer scrap out and new tubes into the building. - Set in the boiler a complete set of 2" SA-178A boiler tubes. - New tubes to be properly flare rolled front and rear of the tube sheets. - Replace hand holes and cover plates removed to perform this work. - Fill the boiler and apply a hydrostatic test below the set pressure of the safety valve. - Leave the area free of debris caused by work. - Close the Boiler. CPS Specifications: - Contractor to secure necessary permits. - Contractor to field verify dimensions and specifics of all projects listed above before placing bid. - Not responsible for contractor errors as a result of non-field verification. - Materials and installation must comply with CPS Standards and Specifications as listed on a) STEAM AND HOT WATER BOILER RENOVATION - Section 23 01 51 b) WATER-TUBE BOILERS - Section 23 52 33 c) FIRE-TUBE AND FIRE-BOX BOILERS - Section 23 52 39 - Secure job site overnight if work is not completed in one day. - If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. - Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. - All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. - Contractor is to remove and dispose of materials torn out and any construction debris. - All trash must be removed off-site by contractor. - Clean the surrounding area and make sure all is swept of debris. - All questions/requests must be received two (2) business days prior to bid closing

Bid Results

Educational

$49,378.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
92
Bidding Soon
1,815
All Active Projects
796
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.