BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2026 at 7:00 PM

Updated February 18, 2026

Site work for a mixed-use development in Milford, Connecticut. Conceptual plans call for site work for a bridge / tunnel; and transportation facility.

This project will replace the Devon Rail Bridge over Housatonic River between Stratford and Milford in Connecticut. Replacement of the Naugatuck Avenue Bridge and Metro-North Railroad Bridge are expected to be replaced concurrently. As of February 17, 2026, further information regarding a design firm and timeline for construction has not yet been established. Design is expected to be completed in December of 2029 with construction to start in the spring of 2030.

Conceptual

Bridges / Tunnels

$307,400,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,059
Active Projects
533
Bidding Soon
5,930
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.