Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 17, 2026 at 7:00 PM

Updated February 18, 2026

Site work for a mixed-use development in Milford, Connecticut. Conceptual plans call for site work for a bridge / tunnel; and transportation facility.

This project will replace the Devon Rail Bridge over Housatonic River between Stratford and Milford in Connecticut. Replacement of the Naugatuck Avenue Bridge and Metro-North Railroad Bridge are expected to be replaced concurrently. As of February 17, 2026, further information regarding a design firm and timeline for construction has not yet been established. Design is expected to be completed in December of 2029 with construction to start in the spring of 2030.

Conceptual

Bridges / Tunnels

$307,400,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,147
Active Projects
455
Bidding Soon
6,706
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed