BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Galena, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

City of Galena, Illinois 500,000 Gallon Spheroid Exterior Overcoat Dry Interior Partial Repaint Wet Interior Spot Repaint And Miscellaneous Repairs Note: This project name is to be understood to include the entire scope of project as defined and detailed by these specifications and Contract Documents The Contractor has the option to perform the work in the Spring of 2024 or Fall of 2024. Spring 2024 Schedule: Commence work on or after April 1, 2024. Substantial Completion by June 3, 2024, including cure and disinfection time. Fall 2024 Schedule: Commence work on or after September 6, 2024. Substantial Completion by October 25, 2024, including cure and disinfection time. SCOPE of WORK Tank Information: The structure is a 500,000-gallon spheroid elevated water storage tank with a low-water level of 104 ft. and a high-water level of 144 ft. located at 11510 Technical Drive in Galena, Illinois. The work includes: Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane fluoropolymer system. Wet Interior - roof weld burns: Spot power tool clean the spot coating failure weld burns throughout the roof to a SSPC-SP11 standard. Apply a spot two (2) coat epoxy system to the prepared surfaces. Dry Interior: Abrasive blast clean the entire tops of the platforms (including 1 ft. up the riser wall), the coating failures on the exposed piping, and spot coating failures throughout to a SSPC-SP6 commercial standard. Apply a spot two (2) coat epoxy system to the prepared surfaces. Foundation: Water clean and apply a two (2) coat epoxy system. Mixer: Install a mechanical mixer. Repairs: 1. Install a gasket on the wet interior roof hatch. 2. Install handholds at the roof hatches. 3. Install a flap gate on the overflow discharge. 4. Adjust the fall prevention device on the dry interior riser and access tube ladders. 5. Install a seal at the access tube air gap. 6. Weld patch plate. 7. Install a roof painter's railing. 8. Weld a rigging lug on the transition cone. 9. Replace the dry interior and aviation light bulbs. MISCELLANEOUS A. The Contractor is to install and operate a pressure tank during the project. Tank to be supplied by Peerless Well and Pump. B. Due to supply chain issues, the Owner reserves the right to require the Contractor to have all of the required coating for the project delivered to the site or to the Owner's storage facility prior to the tank being taken out-of-service and prior to the commencement of the project. ADDITIONAL PROJECT SPECIFIC REQUIREMENTS A. REQUIREMENTS The Illinois Works Jobs Program Act requires that apprentices perform either 10% of the actual total labor hours worked in each prevailing wage classification or 10% of the estimated labor hours in each prevailing wage classification, whichever is less. The Owner has determined that the following alternate is applicable to this project: i. The estimated total project cost is less than $500,000: The 10% apprenticeship goal does not apply.

Award

Water / Sewer

$294,664.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
46
Bidding Soon
670
All Active Projects
289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2023

April 1, 2024

img_map_placeholder

11510 Technical Drive, Galena, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.