Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 27, 2023 at 7:00 PM
Updated January 29, 2024
Site work, paving and outdoor lighting for a mixed-use development in Tiffin, Iowa. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a road / highway; road / highway; and road / highway.
The project shall consist of providing all materials, equipment and labor necessary to install the work as defined as follows: 2442LF of Storm Sewer (size 12-inch - 24-inch, 33 Each Storm Intakes, 6203 SY of Full Depth Reclamation, 4805SY of 6-inch HMA Pavement (Standard Traffic), 3533LF of 36-inch Curb & Gutter Section, 1794SY of 9-inch PCC Pavement, 680SY of 6-inch PCC Pavement, 2022SY of Sidewalks, 489SY of 6-inch PCC Driveway, 1148LF (329LF Trenchless) of 6-Inch DR-18 PVC Watermain, 12 Each Street Lights, Traffic Control, Mobilization and other associated appurtenances and miscellaneous work items. Bid security in the form of a cashiers check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a state-chartered or federally chartered credit union, or a bidders bond with corporate surety satisfactory to the City, in the amount of 10% of the bid. Work shall commence within ten (10) calendar days after receipt of the written Notice to Proceed. All work shall be completed by September 1, 2025 subject to any time extension that may be granted by the Council. One hundred percent (100%) of the bid, with a maintenance period of three (3) years from the time of final project acceptance by the Owner. PREFERENCE By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the state of Iowa. Monthly estimates equivalent to ninety-five percent (95%) of the Contract value of the work completed during the preceding calendar month with 5% retainage. Remaining retainage, if any, will be paid within 30 days after final acceptance by the City.
Bid Results
Water / Sewer
$2,134,857.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 14, 2023
January 15, 2024
Multiple Locations, Tiffin, IA
Related To This Project
Tiffin, IA
Bid Date: Jan 24 2024
Tiffin, IA
Bid Date: Jan 24 2024
Tiffin, IA
Bid Date: Feb 29 2024
Tiffin, IA
Bid Date: Feb 19 2019
Tiffin, IA
Bid Date: Apr 03 2025
Tiffin, IA
--
Tiffin, IA
Bid Date: Dec 17 2024
Tiffin, IA
--
Tiffin, IA
Bid Date: Nov 30 2023
Tiffin, IA
Bid Date: Dec 16 2021
Tiffin, IA
Bid Date: May 26 2023
Tiffin, IA
Bid Date: Oct 12 2023
Tiffin, IA
Bid Date: May 30 2019
Tiffin, IA
Bid Date: Apr 12 2023
Tiffin, IA
Bid Date: Apr 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
