Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 17, 2024 at 7:00 PM
Updated January 29, 2024
Renovation of an educational facility in Creal Springs, Illinois. Completed plans call for the renovation of a educational facility.
As of January 17, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Work to include the removal of existing PIB roof system, removal of existing parapet coping, roof membrane flashing, roof drain assemblies, and the disconnection and salvaging of a rooftop unit for reinstallation. New work to include the installation of new EPDM roof assembly, metal parapet coping, roof drains, walkway pad, pipe seal flashing, and crickets with positive drainage to roof drains. INFORMATION TO BIDDERS: 1. See Section 00 10 00 Instruction to Bidders and Section 00 10 01-Supplemental Instructions to Bidders bound within the Project Manual for further bidding requirements. 2. The successful bidder shall comply with the provisions of the Illinois Prevailing Wage Act, specifically including the payment of the applicable prevailing wages to all laborers, workers, and mechanics performing work under the contract. The District does have a Project Labor Agreement that must be adhered to. 3. Questions to be directed to Architectural: Baysinger Architects, LLC Jake McCann jake@baysingerarchitects.com 401 North Market St. Marion, IL 62959 Ph. 618.993.8250; Fax 618.993.8255 4. The Owner is exempt from sales tax. 5. Payment and Performance Bonds will be required. 6. Bid Bond or Certified Check made payable to the Owner in the amount of 5% of the base bid will be required. 7. Bids shall be awarded to the lowest responsible bidder, considering conformity with specifications, terms of delivery, and quality and serviceability, as determined by the Board. The Owner reserves the right to reject any and all bids in whole or in part or to waive any informality in the bidding process. Any such decision shall be considered final. 8. No bid shall be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of the Owner. 9. Facsimile and electronic bids will not be accepted. Bidders are responsible for ensuring timely delivery of their bids; no late bids will be accepted.
Post-Bid
Educational
$108,600.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 14, 2023
February 5, 2024
15470 Lake of Egypt Rd, Creal Springs, IL
Related To This Project
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
