BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a conference / convention center in San Diego, California. Completed plans call for the renovation of a conference / convention center.

The San Diego Convention Center Corporation ("Corporation") is seeking proposals from qualified contractors ("Contractor") to upgrade the existing lighting control and dimming systems at the San Diego Convention Center. Pre-Bid Question Deadline: December 8, 2023 at 5:00 p.m. local time Response to Pre-Bid Questions: December 13, 2023 at 5:00 p.m. local time Written questions regarding the substance of the RFP must be submitted via e-mail to the procurement contact listed above no later than the Pre-Bid Question Deadline indicated above. E-mailed Bids are due prior to the Bid Deadline indicated above and must be delivered to alyssa.farnsworth@visitsandiego.com. Late bids will not be accepted - NO EXCEPTIONS. The San Diego Convention Center Corporation ("Corporation") is seeking proposals from qualified contractors ("Contractor") to upgrade the existing lighting control and dimming systems at the San Diego Convention Center. For full details of the scope of work, see Section 3 - Scope of Work. Bid Evaluation Contractor will be notified by e-mail December 26, 2023 - January 2, 2024 TBD Shortlist Interviews 111 West Harbor Drive, San Diego, CA 92101 January 8, 2024 - January 9, 2024 TBD Final Evaluation 111 West Harbor Drive, San Diego, CA 92101 January 10, 2024 - January 11, 2024 TBD Notice of Intent to Award (contingent on approvals) Contractor will be notified by e-mail January 12, 2024 TBD Budget Committee Approval Internal approval process Mid-January 2024 TBD Board of Directors Approval Internal approval process Late January 2024 TBD Anticipated Award Date Contractor will be notified by e-mail Late January 2024 TBD : The San Diego Convention Center Corporation ("Corporation") is seeking proposals from qualified contractors ("Contractor") to upgrade the existing lighting control and dimming systems at the San Diego Convention Center (Center). Contractor shall provide a survey of the building, feasibility study, estimation, design, supply, and installation of lighting control and dimming systems in Corporation exhibit halls. Contractor shall evaluate current dimming and lighting control systems and prepare their proposals such that they integrate current material and devices into the newer system. Contractor shall prepare proposals based upon two options either to re-use the existing material and update the software after minor modifications and revisions to the current infrastructure and equipment, or propose the installation of brand-new control devices and software so that the current devices and material utilization is maximized. Once Corporation selects the project method, Contractor shall develop the drawings necessary to submit and receive approved permits from the City of San Diego. Contractor shall remove/install necessary equipment and make modifications and upgrades per current situation and physical condition. Testing shall be conducted prior to project completion to ensure the devices are installed properly and are fully functional. As-built drawings shall be provided to document final project installation. This project is to be accomplished by review of existing documentation, discussions with onsite personnel, and per the following codes and standards/manufacturers' instructions: o CEC - California Electrical Code, Title 24, Part 3, including all applicable Amendments and Supplements, as based on NFPA 70 o CBC - California Building Code, Title 24, Part 2 o CFC - California Fire Code, Title 24, Part 9 o CAC - California Administrative Code, Title 24, Part 1 o CMC - California Mechanical Code, Title 24, Part 4 o CEC - California Energy Code, Title 24, Part 6 o CGBS- California Green Building Standards Code, Title 24, Part 11 o NFPA - National Fire Protection Association o NEMA - National Electrical Manufacturers Association o ANSI - American National Standards Institute o IEEE - Institute of Electrical and Electronic Engineers o UL - Underwriters Laboratories o CAL/OSHA - State of California Low-Voltage Electrical Safety Orders o CAL/OSHA - State of California High Voltage Electrical Safety Orders o Codes and regulations noted in other Sections in Division 26 Should conflicts exist between the above referenced standards, it is Contractor's responsibility to bring the conflict to Corporation's attention. In general, in the event of a conflict, the most stringent of the requirements will apply. Corporation makes no warranty as to the accuracy of any existing drawings. Bidders shall verify all quantities, dimensions, conditions and variables of all existing infrastructure and equipment prior to submittal of a bid. To meet current code requirements and modernize the exhibit hall lighting system, Corporation is considering the following options for this project: Option A: Upgrade the program/software of the existing control and dimming system so that the system can function in at least three pre-setup and or customized configurations without any functional delays and unrecognizable to zero seconds program logic execution sequential gaps. The new software should have both on-site and remote-control capabilities. Option B: Supply, and installation of advance and smart control systems (Lutron, Crestron, Leviton lighting control systems brands, or proposed comparable best suited solutions) so that the system can function with multiple pre-setup and customized modes. The system will need to have capacities for future expansion. The system will need to be able to accommodate different lighting fixtures across other locations of the facility.

Post-Bid

Conference / Convention Centers

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
43
Bidding Soon
737
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2023

January 22, 2024

img_map_placeholder

111 Harbor Dr, San Diego, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.