EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 4, 2024 at 7:00 PM

Updated December 5, 2024

Site work for a water / sewer project in Darien Center, New York. Completed plans call for site work for a water / sewer project.

This project includes the installation of approximately 27,700 LF of 6-inch PVC force main from the Darien Center Wastewater Treatment Facility (WWTF) to the Village of Corfu WWTF and site improvements at the Darien Center WWTF and Village of Corfu WWTF. The Darien WWTF will include the installation of a new 10-foot diameter wet well, two submersible sewage pumps, a headworks screen, valve/meter vault, a prefabricated FRP building, a Bioxide storage tank/chemical dosing pump, modifications to existing onsite steel tanks to be utilized as onsite equalization, onsite ductile iron force main piping, fittings and all associated electrical and site work to complete this Contract as designed. The Village of Corfu WWTF will include the installation of a precast concrete equalization tank, onsite ductile iron force main piping, fittings, and all associated electrical and site work to complete this Contract as designed. The bidder shall have at least 3 years' experience in the performance of contracts similar to the work of this contract under its present managment. The bidder shall have completed at least 3 contracts, with at least 2 contracts for municipalities or government agencies, these installations being comparable in size, type, and locality to the work to be formed under this contract. Bidder shall submit qualification statement (EJCDC C-451/Specification 00451) as required by the owner and engineer. The project is required to meet MWBE participation goals (20% participation goals per EFC Funding requirements, and 30% participation goals per NYSDEC requirements). Good faith efforts to promote and assist in the participation of Service Disabled Veteran Owned Businesses (SDVOB) are encouraged. To qualify, contractors must be registered as a certified Minority- and Women-Owned Business Enterprise (MWBE) withing New York State, or include an MWBE-certified subcontractor to meet participation goals. Contract term: Substantial completion: 180 days, Final payment: 210 days Total MWBE Participation Goals: 30% Only written Requests For Information (RFI) will be accepted. RFI's will be accepted until 12:00 p.m. (Local Time) on November 19, 2024, at the office of the Engineer to the attention of Dave Hardenbrook via email: DHardenbrook@CPLteam.com. If necessary, an Addendum will be issued by 5:00 p.m. (Local Time) on November 19, 2024, from the office of the Engineer. Bid security shall be furnished in accordance with the Instructions to Bidders. Each bid must be accompanied by a certified bank check or bid bond from a domestic carrier licensed to do business in the State of New York in the amount of not less than five (5%) of the amount of the bid submitted. Security for Faithful Performance: The successful bidder will be required to furnish Performance and Labor and Material Payment Bonds written by firms licensed to do business in New York State, each in the amount of one hundred percent (100%) of the contract amounts in accordance with the provisions of the Contract Documents.

Bid Results

Water / Sewer

$4,551,626.00

Public - City

Site Work

64

25

38

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Temporary Access Roads, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Accessories
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Electric Traction Elevators, Lifts, Vehicle Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Power Filters and Conditioners, Capacitors
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Special Foundations, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Wetlands, Constructed Wetlands, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Ground Covers, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Lifts, Slings
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas and Liquid Storage, Gas and Liquid Storage Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
130
Bidding Soon
2,498
All Active Projects
930
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

March 20, 2025

img_map_placeholder

To Be Determined, Darien Center, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.