Published January 17, 2024 at 7:00 PM

Updated August 3, 2024

Renovation of an educational facility in Denver, Colorado. Completed plans call for the renovation of a 21,360-square-foot, three-story above grade educational facility.

Reference Number 0000336308 *Estimated Construction Cost: $9,511,692.00 (total for A and B) -Anticipated Contractor Start February 1, 2024 -Anticipated Construction Start February 12, 2024 - A Substantial Completion May 31, 2024 - B Substantial Completion November 15, 2024 Community College of Denver (CCD) invites bids from General Contractors for services associated with the Clear Creek Building Mechanical Upgrades and Renovation projects on the Auraria Higher Education Center campus. CCD must split this into two separate projects due to the types of funding (Project A and Project B). The selected General Contractor will be required to track and bill these projects separately, including separate pay applications and closeout documents for each project. A single General Contractor will be selected from this process. Construction is anticipated to begin as early as February 2024. Project A must reach Substantial Completion by 5/31/2024 and Final Acceptance by 6/30/2024 (including all closeout documentation and retainage payment advertised and paid). Project B must reach Substantial Completion by 11/15/2024 and Final Acceptance by 12/20/2024 (including all closeout documentation and retainage payment advertised and paid). *Project A* Description CCD has been approved for federal HEERF funding up to $3M for this project. This project includes, but is not limited to, replacement of the HVAC system, new boiler room, replacement of the electrical service, structural work, ceiling removal and replacement, removal of the trees and infill of the slab in the atrium in CCD's Clear Creek Building. *Project B* Description This project consists of the remodel and upgrade of the 15,128 SF CCD's Clear Creek Building. The project includes, but is not limited to, upgrade of the fire sprinkler system, upgrade of the fire alarm system, replacement of the roof, replacement of glazing, replacement of the elevator, remodeling of the building interior, and exterior improvements. Project B will be funded with local capital/cash funds. Question Acceptance Deadline 12/07/2023 at 4:00 PM MT EST Questions are submitted online No -- Clarification Name: Stacy Tino, CPPB, NIGP-CPP, Procurement Director Agency: Auraria Higher Education Center Phone: 303.556.3289 Email: stacy.tino@ahec.edu General Requirements - Contractors License Required - Federally Funded - Insurance Required - Prevailing Wage Required Buyer Requires E-Bonding - Bid Bond 5 % - Performance Bond 100 % - and Materials Bond 100 % *As of December 18, 2023, addendum 2 and a revised drawing log have been issued.

Award

Educational

$8,749,010.00

Public - City

Renovation

114

32

18

5

Subscribe For Documents

91 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
73
Bidding Soon
1,306
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2023

February 12, 2024

Project location map

1030 St Francis Way, Denver, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.