BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Francisco, California. Completed plans call for site work for a water / sewer project.

**As of February 21, 2024, this project has not yet been awarded. Anticipated award for February 2024.** **As of February 13, 2024, this project has not yet been awarded. A timeline for award has not yet been established. All questions below this line were received after the 10 days prior to bid deadline. Please be advised that prior to receiving these materials, all requestors will be required to complete, sign, and comply with a Confidentiality Agreement. The objective of the project is to improve existing San Joaquin Pipeline (SJPL) System so that it will allow safe personnel entry into segments of pipelines without a system shutdown. This contract is for the improvements of Phase 2 which focuses on the crossover valves between SJPL #1 and SJPL #2 and the inline valves on SJPL #1 in the crossover vaults. The scope of work will include 1) uprate 60-inch butterfly valves on SJPL#1 in the crossover vaults at Pelican, Emery and Roselle with City Furnished 60-inch butterfly valves; 2) Replace SJPL #1/SJPL #2 related crossover butterfly valves with City Furnished double knife gate valves in Pelican, Roselle and Emery Crossover Vaults. 3) Associated Structural, electrical and I&C work. The work is to be performed in Stanislaus County, California. Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B and Section 2.01 of Attachment 6. The Local Business Enterprise (LBE) subcontracting requirement is 8.00%. The LBE subcontracting requirement can only be met with CM D certified San Francisco Micro and Small-LBEs and SFPUC Micro & Small-LBEs. The requirement is less than 20% because most of the work is specialized installation of large diameter valves and appurtenances. In addition, constraints such as the location of the work sites (spread across San Joaquin Valley from Vernalis to Oakdale) and the construction timeframe (limited to 60-100 days during a yearly water system shut down) reduces the number of subcontractors available to perform work on the contract. Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified with CM D in the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on CM D Form 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Adriana Duran at (415) 598-7368 or Adriana.Duran@sfgov.org for further information. To join, enter Meeting ID and click Join. When prompted, enter the meeting Passcode. To participate by phone, dial +1.213.338.8477 and enter the Meeting ID followed by # key. When prompted, enter the meeting Passcode and # key. Attendance of remote attendees will be completed at the end of the pre-bid meeting. SFPUC encourages Bidders to complete the Safety Prequalification Web Form at least 3-weeks prior to the date of Bid opening in accordance with Section 00 21 13 - Instructions to Bidders. Bidders are required to pass the Safety Prequalification prior to SFPUC considering their bid submission complete. SFPUC will notify Bidders that have passed the Safety Prequalification prior to or on the date of Bid opening. Refer to Section 00 21 13 - Instructions to Bidders, Bidder Qualifications and the website listed above for additional information A Class A California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing. All questions above this line were received prior to the 10 days prior to bid deadline

Bid Results

Water / Sewer

$5,602,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
82
Bidding Soon
1,854
All Active Projects
754
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

June 12, 2024

img_map_placeholder

Multiple Locations, San Francisco, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.