BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a civil project in Woodland, Washington. Completed plans call for the renovation of a water / sewer project.

Filter 2 and 3 Restoration and Media Replacement. Work on this project includes recoating and rehabilitation of an existing water treatment package filters, including recoating of each filter vessel, containment, replacement of filter and adsorption clarifier media, and structural reinforcement of corroded metal, if necessary. The Work shall be substantially complete within 250 working days after the commencement date stated in the Notice to Proceed. All Proposals must be accompanied by a certified check, postal money order, cashier's check, or Proposal bond payable to the City of Woodland and in an amount of not less than five percent (5%) of the total Proposal amount. This project is funded through the Washington State Drinking Water State Revolving Fund program with federal funds from the Environmental Protection Agency. The City of Woodland expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal. The Work shall be substantially complete within 250 working days after the commencement date stated in the Notice to Proceed. All work performed on this project will be subject to the higher of the prevailing state or federal wage rates. Contract questions shall be directed only to the office of the Project Engineer. A fair share objective is a goal based on the capacity and availability of qualified, certified Minority Business Enterprises (MBEs) and Women's Business Enterprises (WBEs) in the relevant geographic market. As mandated by EPA, all general contractors and subcontractors must comply with the requirements of the EPA's Program for Utilization of Small, Minority, and Women's Business Enterprises (40 CFR, Part 33) in procurement under the DWSRF program. The goals for the utilization of disadvantaged businesses are as follows: Construction 10% MBE 6% WBE Supplies 8% MBE 4% WBE Equipment 8% MBE 4% WBE Purchased Services 10% MBE 4% WBE Contract questions shall be directed only to the office of the Project Engineer.

Bid Results

Water / Sewer

$1,356,486.00

Public - City

Renovation

9

11

8

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
34
Bidding Soon
505
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2023

January 18, 2024

img_map_placeholder

To Be Determined, Woodland, WA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.