Published April 7, 2025 at 8:00 PM

Updated April 8, 2025

Renovation of a detention facility in Columbus, Ohio. Completed plans call for the renovation of a detention facility.

As of April 7, 2025, a general contractor was awarded. Construction began in June 2024. A timeline for completion has not been determined. *The closed solicitation has been included below for reference: The Department of Rehabilitation and Corrections is looking to add two negative pressure rooms in each of our medical services areas throughout the state. This project currently includes 16 facilities, but we understand that our budget will not allow us to complete all the facilities, so we plan to prioritize the facilities once we figure out the cost per facility. The design will be specific to each facility, and we may need to create multiple bid packages to group facilities by location. The project goal is to minimize the spread of infectious diseases within our facilities and to protect staff and incarcerated offenders. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Diversity, Growth& Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Professional Services Start: 02 / 24 Construction Notice to Proceed: 01 / 25 Substantial Completion of all Work: 02 / 26 Professional Services Completed: 04 / 26 Submit all questions regarding this RFQ in writing to Nichole Burns at Nichole.Burns@odrc.state.oh.us with the project number included in the subject line. EDGE Participation Goal : 5.0%

Under Construction

Jails / Prisons

$2,800,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
117
Bidding Soon
1,559
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2023

June 3, 2024

Project location map

Multiple Locations, Columbus, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.