BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Mandeville, Louisiana. Completed plans call for site work for a water / sewer project.

Mandeville Middle School, Drainage Improvements All bids must be accompanied by bid security equal to five percent (5%) of the sum of the base bid and all alternates, and must be in the form of a certified check, cashier's check or bid bond, as outlined in the Instructions to Bidders. The Successful Bidder will be required to furnish a performance and payment bond, each in an amount equal to 100% of the contract amount. No bid may be withdrawn except as provided for by law. Bidders must meet the requirements of the State of Louisiana Contractor's Licensing Law, La. R.S. 37:2150.1 through 2164, as amended. Preference may be given to materials, supplies and provisions produced, manufactured or grown in Louisiana in accordance with law. The Owner reserves the right, in accordance with law, to reject any and all bids. Visitors on St. Tammany Parish Public School campuses are required to check in at the front office of the school. If there are any questions regarding this project, please contact the St. Tammany Parish Public School System Construction Department at 985-898-3287. COMPLETION TIME: The Bidder shall agree to fully complete the contract within Sixty (60) consecutive calendar days, subject to such extensions as may be granted in accordance with the Contract Documents, and acknowledges that this construction time will start on or before the date specified in the written "Notice to Proceed from the Owner. The "Notice to Proceed" will be issued effective May 27, 2024 with an assembly period being granted ahead of the "Notice to Proceed" to allow time to secure permits and procure materials to facilitate the on-site start date of May 27, 2024. Refer to Section 01010-Summary of Work for more information. LIQUIDATED DAMAGES: The Bidder shall agree to pay as Liquidated Damages the amount of One Thousand Dollars ($1,000) for each consecutive calendar day for which the work is not complete, beginning with the first day beyond the completion date stated on the "Notice to Proceed", Said sum shall in no event be construed to be a penalty; but only as damages fixed and agreed upon in advance.

Bid Results

Water / Sewer

$173,250.00

Public - County

Site Work

6

6

9

6

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
37
Bidding Soon
553
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

May 27, 2024

img_map_placeholder

2525 Soult St, Mandeville, LA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.