BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Robertsdale, Alabama. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Robertsdale Sidewalk Project- clearing and grubbing (maximum bid $8000 per acre) (approximately 2.41 acres) removing headwalls removing tree (8 - 18 inch) removing tree (19 - 36 inch) removing stump (19 - 36 inch) 18" roadway pipe (class 3 r.c.) 24" roadway pipe (class 3 r.c.) 22" span, 14" rise roadway pipe (class 3 r.c.) 24" storm sewer pipe (class 3 r.c.) 22" span, 14" rise side drain pipe (class 3 r.c.) A Cashier's Check (Drawn on an Alabama Bank) or Bid Bond for 5% of the Amount Bid (Maximum of $10,000.00) and Made Payable to the City of Robertsdale Must Accompany Each Bid as Evidence of Good Faith. The Entire Project Shall Be Completed in 280 Calendar Days. The Successful Bidder Will Be Required to Provide Performance and Payment Guarantees (Bonds) Which Are Acceptable to the Owner, in the Amount of 100% of the Contract Price, Prior to Execution of Contract by the Owner. Proof of Insurance Coverages of the Types and Amounts as Set Forth in the Project Specifications Will Be Required of the Contractor, and Any and All Subcontractors, Prior to Beginning Work. The Contractor Will Be Required to Perform Work Amounting to at Least 30% of the Total Contract Cost With His Own Organization. Attention of Bidders is Called to the License Required by Title 34, Chapter 8, of the Code of Alabama, 1975, and Amendments Thereto, Relating to the Licensing of General Contractors. No Bid Will Be Accepted From Anyone, Except a Qualified Contractor, Licensed by the State Licensing Board for General Contractors, Unless Otherwise Required by the State Licensing Board. The Right to Reject Any or All Bids and to Disregard Any Minor Irregularities is Reserved by the Owner. Contractor Prequalification Is Not Required To Bid On This Project. However, The Award Of The Contract Will Not Be Made To Any Bidder Who, At The Time Of The Award, Is Considered By The Alabama Department Of Transportation (Aldot) To Be Disqualified From Bidding, Nor To Any Bidder Who Is An Affiliate Of Or Has A Corporate Officer, Director, Or Principal Owner Who Is A Corporate Officer, Director, Or Owner Of, Another Person Who Is Presently Disqualified By Aldot. Further Details And Definitions Regarding This Provision Are Included In The Project Specifications. The Bracket Estimate on This Project is From $1,000,000.00 to $1,874,000.00. This Bracket Range is Provided Only as a General Indication of a Broad Financial Size Category for the Project. It Should Not Be Used in Preparing a Bid, Nor Will It Have Any Bearing on Any Decision to Award the Contract. The Principal Items of Work Are Approximately as Follows: Sidewalks and Associated Drainage Along East Silverhill Ave, Buck Road, Wilters Street, College Ave, Us Highway 90 (Old Spanish Trail). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Sidewalks / Parking Lot

$1,227,500.00

Public - City

Paving, Site Work

69

6

11

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
40
Bidding Soon
477
All Active Projects
185
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2024

March 25, 2024

img_map_placeholder

Multiple Locations, Robertsdale, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.