Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 4, 2024 at 7:00 PM
Updated March 5, 2024
Renovation of a residential development in Lake Linden, Michigan. Completed plans call for the renovation of a residential development.
Project consists of work at 2 apartment buildings, Maple Lane and Rustic Meadows, and also work at 16 residential houses for the Lake Linden Housing Commission. Work will be split into 2 Phases. Phase 1 will consist of installing a new fire alarm system, replacing/adding door hardware and door closers on existing door slabs, installing keypad access to main entry doors at both apartment buildings, remove and replace a slab door and remove existing slab door and infill wall. Phase 1 also includes installing hardwired smoke. carbon monoxide detectors in all 16 houses, replacing/adding door hardware and replacing all windows on all 16 houses. Phase 2 will consist of adding air conditioning in hallways at both apartment buildings, asphalt shingle replacement on 3 residential houses, exterior painting at 4 residential houses, and waterproofing foundations and adding drain tile at 3 residential houses. Project Location: 210 Calumet Street, Lake Linden, Michigan, 49945. 1. Maple Lane and Rustic Meadows Apartment Complexes and 16 residential houses in Lake Linden. See plans for addresses Project 1 - Door Hardware: New door hardware as indicated on the plans at Rustic Meadows and Maple Lane. New exterior door hardware and deadbolts at 16 houses as indicated on the plans. Also, the removal and replacement of a door slab and wall infill at Rustic Meadows. Project 2 - Reroofing and Painting: Removal and replacement of asphalt shingles and underlayment at 4 residential houses and exterior painting at 4 residential houses. Project 3 - Window Replacements at 16 Houses: Removal and replacement of windows at 16 residential houses. Project 4 - CorridorAC at Rustic Meadows and Maple Lane: HVAC work at both apartment buildings. Project 5 - Site Work: Waterproofing foundations and adding drain tile at 3 residential houses. work substantially complete by September 13, 2024, with final completion October 11, 2024.
Post-Bid
Residential Subdivision
$35,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 29, 2024
April 1, 2024
Multiple Locations, Lake Linden, MI
Related To This Project
Lake Linden, MI
Bid Date: Mar 22 2024
Lake Linden, MI
--
Lake Linden, MI
Bid Date: May 02 2019
Lake Linden, MI
Bid Date: Jul 09 2025
Lake Linden, MI
Bid Date: Apr 26 2023
Lake Linden, MI
Bid Date: Feb 08 2023
Lake Linden, MI
Bid Date: May 06 2022
Lake Linden, MI
Bid Date: Jan 25 2023
Lake Linden, MI
Bid Date: Jan 18 2023
Lake Linden, MI
Bid Date: Dec 21 2022
Lake Linden, MI
Bid Date: Dec 14 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
