Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 15, 2025 at 8:00 PM
Updated July 16, 2025
Site work for a water / sewer project in Dublin, Ohio. Conceptual plans call for site work for a water / sewer project.
Update: This project provides for a 30-inch diameter parallel trunk sewer installation along South Riverview Street between E. Bridge Street and Short Street. The need for this project was identified in the Deer Run Sanitary Sewer Modeling Report from 2012 and a Sanitary Sewer Modeling Update from 2019. Providing this improvement will increase system capacity and reduce the occurrences of sanitary system overflow and water in basement events in the Deer Run sanitary system. This will also help to fulfill the obligation of the Director's Final Findings and Orders from the Ohio EPA. Detailed design began in 2024 and will continue into 2025. Acquisitions are planned for 2027. Construction is planned for 2028, pending site acquisitions. This project will be performed in conjunction with the South Riverview Street Stormwater Improvements CIP project to minimize disruption to the area. Project is included in City of Dublin Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project provides for a 30-inch diameter parallel trunk sewer installation. The need for this project was identified in the Deer Run Sanitary Sewer Modeling Report from 2012 and the Sanitary Sewer Modeling Update from 2019. Providing this improvement will increase system capacity and reduce the occurrences of sanitary system overflow and water in basement events in the Deer Run sanitary system. This will also help to fulfill the obligation of the Director's Final Findings and Orders from the Ohio EPA. Detailed design for the project is planned for 2024. Site acquisitions are planned for 2027 if necessary. Construction is planned for 2028, pending site acquisitions if necessary. This project will be performed in conjunction with the South Riverview Stormwater Improvements CIP project to minimize disruption to the area. Fiscal year 2024-2028 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$3,440,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2028
S Riverview St, Dublin, OH
Related To This Project
Dublin, OH
Bid Date: Feb 07 2024
Dublin, OH
--
Dublin, OH
--
Dublin, OH
Bid Date: Nov 22 2024
Dublin, OH
Bid Date: Feb 21 2024
Dublin, OH
Bid Date: Feb 21 2024
Dublin, OH
Bid Date: Feb 21 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
