BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Perry, Florida. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The project consists of providing all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Removal and replacement of concrete joints, removal and replacement of damaged concrete pavement, and other miscellaneous concrete rehabilitation work. The contract time for substantial completion of the Base Bid work shall be 30 calendar days from the date of the "Notice to Proceed (NTP)." The final project completion shall be 60 calendar days from the date of the "Notice to Proceed (NTP)". Additional days will be awarded if additional alternates are awarded. Beginning on Wednesday, November 29, 2023, drawings, specifications, and project documents may be examined by appointment at the Airport Terminal Building of the Perry Foley Airport at 481 Industrial Park Drive, Perry, Florida 32348. Appointments may be made by calling Ward Ketring at Perry Foley Airport at 850-838-3519. Bid security in the amount of at least five percent (5%) of the total quote must be submitted with the quote. The quote security may be either a certified check or a proposal guaranty bond executed by a surety company authorized to do business in the State of Florida. Quote security shall be made payable to Taylor County. The successful contractor must be able to furnish proof of required insurance, a 100% Performance Bond, and a 100% Labor and Materials Payment Bond, and shall begin execution of this contract within five (5) calendar days following the date of the Notice to Proceed. Funding for this project is being provided by the Florida Department of Transportation and will be subject to all applicable requirements of the U.S. Department of Transportation grant assurances. The successful contractor will be required to comply with all provisions of the Federal Government Equal Employment Opportunity clauses issued by the Secretary of Labor on May 21, 1968 and published in the Federal Register (41CFR Part 60-1, 33 F.2 7804). Wages paid to employees must comply with the minimum established by the U.S. Department of Labor Wage Determination. The successful contractor must comply with the Davis-Bacon Act, Copeland Act (Anti-Kickback Act), the Occupational Safety and Health Act, the Contract Work Hours and Safety Standards Act (CWHSSA), Title VI of the Civil Rights Act of 1964 and Executive Order 11246. Taylor County has an approved Disadvantaged Business Enterprise (DBE) Program for Airport Improvement Program projects which the successful contract must comply with. The DBE participation goal for this project is 4.78% and compliance requirements are listed in the project documents. The Taylor County Board of County Commissioners reserves the right, it its sole and absolute discretion, to reject, to cancel, or withdraw this bid at any time and waive any irregularities in the bid process. The County reserves the right to award any contract to the respondent which it deems to offer the best overall service; therefore, the County is not bound to award any contract based on the lowest quoted price. The County, in its sole and absolute discretion, also reserves the right to waive any minor defects in the process and to accept the bid deemed to be in the County's best interest. No faxed Proposals will be accepted. OWNER'S CONTACT: Jami Evans County Grants Coordinator Taylor County Board of County Commissioners 201 East Green Street Perry, Florida 32347 Tel: 850-838-3553 ENGINEER'S CONTACT: John Collins, P.E. Senior Project Manager AVCON, INC. 320 Bayshore Drive, Suite "A" Niceville, Florida 32578 Tel: 850-678-0050 All bids should be addressed as follows: BID ENCLOSED: CONCRETE APRON REHABILITATION - PHASE 2 PERRY FOLEY AIRPORT Taylor County Board of County Commissioners Attention: Clerk's Office 108 North Jefferson Street Perry, Florida 32347

Award

Transportation Terminals

$725,000.00

Public - City

Paving, Site Work

27

7

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
26
Bidding Soon
356
All Active Projects
156
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2024

February 15, 2024

img_map_placeholder

481 Industrial Dr, Perry, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.