BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2024 at 7:00 PM

Updated January 29, 2024

Site work for a playground / park / athletic field in Spanish Springs, Nevada. Completed plans call for site work for a playground / park / athletic field.

Scope of Work: Approximately 131 Square Feet of running track repairs for a 400M, 8 lane track, 4-150 foot runways for pole vault, long jump, and high jump d-zone including all surface preparation, various crack repairs and leveling. A 3mm re-top of the existing rubber surface with specified striping. In addition, crack sealing of all adjacent curbs and valley gutters is to be included. An additional 100 Square Feet at various locations shall be considered as contingency within base bid of work. Question Deadline: Wed 12/20/2023 04:30 PM* Questions submitted online. Contractors desiring to bid on this work shall be contractors presently licensed by the Nevada State Contractors Board and shall maintain a valid Contractor's License for the duration of the construction project. In addition, any and all Subcontractors that will be utilized by the Contractor shall also be presently licensed by the Nevada State Contractors Board and shall maintain a valid license for the duration of the construction project.

Award

Playgrounds / Parks / Athletic Fields

$147,400.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
30
Bidding Soon
319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2024

February 5, 2024

Project location map

1065 Eagle Canyon Dr, Spanish Springs, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.