BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in New York, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.

*Due to the sensitive nature of the project, reference documents will not be posted. Please obtain documents through the means listed in the invitation to bid.* Est $ Range: Over $100M The Metropolitan Transportation Authority ("MTA"), by and through its agent MTA Construction & Development Company ("MTACD"), both of which are public benefit corporations existing by virtue of Article 5, Title 11 of the Public Authorities Law, are soliciting Statements of Qualifications (SOQs) from entities interested in providing design-build services for Contract CH057A2 - Design Build Services for Westbound Bypass Part 2, as part of the Harold Regional Investments Project. MTACD seeks respondents who are qualified and prepared in all respects to design and construct the work of Contract CH057A2 in its entirety, on schedule and within budget. Respondents with current contracts to perform work on MTA projects must be in good standing and satisfactorily progressing the work on such contracts to be deemed qualified to participate in this pre-qualification process and the subsequent Request for Proposal (RFP) process with the pre-qualified firms. The Work of Contract CH057A2 consists of final design and construction of a new grade-separated track together with the associated approach structures, construction of a new pump house and communication hut and associated mechanical and systems infrastructure, demolition of existing track work and installation of new track, including special track work, and demolition of existing structures and installation of new traction power elements, including, but not limited to, the cabling, contact & messenger wires, feeder cables and their supporting structures. The Work will be performed in an active railroad interlocking and will require close coordination with the ongoing train operations and force account work performed by Amtrak, LIRR and other Harold contractors. It is anticipated that the construction of the structure beneath the existing tracks will occur under track outage(s) for ERT Line 2 and ERT Line 4. The track outages may be limited to weekends only. Funding: 100% FTA

Post-Bid

Roads / Highways

$100,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
474
Active Projects
246
Bidding Soon
4,721
All Active Projects
2,180
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.