BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2024 at 7:00 PM

Updated January 29, 2024

Site work for a water / sewer project in Commerce City, Colorado. Completed plans call for site work for a water / sewer project.

**As of January 15, 2024, project was awarded to Brannan Construction Company. awarded amount is $1,824,800.50** 2024 SACWSD 12-Inch Irrigation Distribution Line. No pre-bid meeting will be held for the project. The project generally consists of installing 4-inch and 12-inch irrigation water lines, connecting the new irrigation water lines to existing irrigation lines on adjacent side streets, and removing seven existing interconnects between the potable and irrigation systems for the South Adams Water and Sanitary District in Commerce City, Colorado. The 12-inch irrigation line is to be constructed in Chambers Road right-of-way, between E. 103rd Place to E. 96th Avenue, with 4-inch and 6-inch side street connections adjacent to Chambers Road. The District reserves the right to reject any and all Bids, to waive informalities, and to reject non-conforming, non-responsive, or conditional Bids.. The successful Bidder will be required to furnish a Construction Performance Bond and a Construction Payment Bond as security for the faithful performance and the payment of all bills and obligations arising from the performance of the contract. The project is comprised of installing approximately 4,600 lineal feet of 12-inch and 440 lineal feet of 4-inch irrigation water line. It is anticipated that the Contract Agreement will be signed and the Notice to Proceed will be issued in late January 2024. Substantial completion of the project shall be reached by April 15, 2024. All construction shall be completed and ready for final payment within one hundred twenty (120) calendar days from the Notice to Proceed date. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. For questions, email Shelby Berke with Muller Engineering at sberke@mullereng.com.

Award

Water / Sewer

$1,824,801.00

Public - County

Site Work

19

13

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
64
Bidding Soon
1,295
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

February 15, 2024

Project location map

Multiple Locations, Commerce City, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.