Demolition, site work and new construction of a municipal facility in Santa Barbara, California. Completed plans call for the demolition of a 4,818-square-foot municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.

**As of January 11, 2024, this project has not yet been awarded. The project is expected to be awarded on January 16, 2024.** LOCATION OF THE WORK: The Work is to be constructed at the Headquarters of Goleta West Sanitary District. The Site, which does not have a specific street address, is on Santa Barbara Municipal Airport property in the City of Santa Barbara, Santa Barbara County, State of California. It is located at Parking Lot 32 on the campus of the University of California, Santa Barbara, adjacent to the Police Station. Associated utility service work may extend beyond the boundary of the Goleta West Sanitary District facility. DESCRIPTION OF THE WORK: GOLETA WEST SANITARY DISTRICT, Headquarters, Building Upgrades, PROJECT 13-04, NEW ADMINISTRATION BUILDING The Work encompasses deconstruction of approximately 1,170 SF of existing single-level, wood and masonry structures, concrete slabs, foundations, utilities, and infrastructure. In addition, general Site preparation will be necessary to accommodate new construction. New construction will encompass a 3,298 SF single-level, on-grade, structure to house Administrative Offices, Public Lobby and Service Counter, Board Room, and office support spaces. Access to the Public Lobby and a separate, exterior, access to Board Room will be provided under a shaded colonnade, forming the north boundary of a 1,520 SF landscaped Courtyard. The Site, located within a FEMA designated Special Flood Hazard Area. is protected from flooding by a FEMA compliant Perimeter Flood Wall. The Perimeter Flood Wall is comprised of permanent concrete masonry and cast-in-place concrete walls and demountable flood barriers. The Perimeter Flood Wall shall remain in place, and functional, throughout the course of construction. New construction shall occur immediately adjacent to components of the Perimeter Flood Wall. Portions of the Perimeter Flood Wall will be incorporated into the new work, including the cast-in-place concrete wall along the south boundary line. Consequently, these must be protected from damage and maintained clear and accessible for their function, as part of the Perimeter Flood Wall. Additional work includes Landscaping west of the Administration Building, at the north end of the entire Site, and at a raised, planter along the east face of the Administration Building. Finish Site Work shall include paving of the entire work yard, including removal, and proper disposal, of any and all existing paving. Additionally, placement of pervious concrete pavement east of the new Administration Building will accommodate three parking spaces. The Work shall include installation of two (2) Electric Vehicle Charging Stations, east of existing Pump Station #1, which has been previously prepped to accept the equipment. The sealed envelope containing the Bid shall also bear the words Bid for GWSD Headquarters, Building Upgrades - PROJECT NO. 13-04 New Administration Building Additional Pre Bid Note: If requested, by the District, all attendees of the Pre-Bid Conference and walk-through will be required to review and execute a COVID-19 Waiver and Release of Liability form which will be provided by the District. All attendees of the Pre-Bid Conference and walk-through must comply with protocols relating to COVID-19 as set forth by then-existing Center for Disease Control guidance or mandates. Questions received no later than 5:00PM PST, Wednesday, December 13th will be answered.

Award

Municipal

$4,418,000.00

Public - County

Demolition, LEED Certification, New Construction, Site Work

74

34

2

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
22
Bidding Soon
357
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2023

February 19, 2024

img_map_placeholder

100 Adams Rd, Santa Barbara, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.