Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and asbestos abatement for a sidewalk / parking lot in East Fayetteville, North Carolina. Completed plans call for the demolition of a sidewalk / parking lot; for site work for a sidewalk / parking lot; and for asbestos abatement for a sidewalk / parking lot.
Bid price and scope of work required shall include the following unless otherwise stated: Demolition and removal of all structures, accessory structures, well/pump houses, old fencing, walls, signs, sign poles, foundations, basements, pools, footings, walkways, steps and remove slab on the parcels (if applicable). Remove all items left on property to include trailers, box trailers storage bins and fencing. Unless specified, asphalt or concrete parking surfaces and driveways are to remain. Disturbed areas of the lot must be smooth and graded to allow for proper natural drainage and growth. If necessary, approved fill must be added to bring excavated areas to the grade of the existing lot. Straw and seed removed slab foundation areas. emoval of all rubbish, trash and debris, tall weeds, tall grass and undergrowth from the entire site including cut limbs, logs, downed trees, organic debris piles and junk vehicles (if applicable) on property. Cut all vegetation to property lines and remove any trees or saplings less than 3in in diameter. Demolition will not be cleared if vegetation remains uncut. Disposal of all debris at approved landfills or processing sites. All costs associated with the abatement of all identified Asbestos Containing Materials by a licensed contractor Contractor shall obtain at his/her expense all required permits (demo), licenses, bonds, insurance, reports, designs, engineering and/or inspections. All work must be completed within 60 calendar days after notice to proceed has been issued unless otherwise stated. Contractor is responsible for contacting City for inspection upon beginning and completion. With the exclusion of lawful asbestos removal, contractor shall not assign, subcontract, or transfer any rights under or interest in (including, but without limitation, monies that may become due or monies that are due) the Agreement without the written consent of the City. Contractor is responsible for complying with all Local, State and Federal rules, codes, laws and legislation -Dump tickets or invoiced disposal receipts must be submitted at completion of all work in order for payment to be processed. Demolition, Asbestos Abatement & Lot Cleaning (401 Johnson St & 1805 Ramsey St). The right is reserved to reject any or all bids and to waive all informalities concerning bid or award bid to the lowest, responsible bidder or bidders, taking into consideration quality, performance and the time specified in the proposals for the performance of the contract.
Award
Sidewalks / Parking Lot
$27,701.00
Public - City
Asbestos Abatement, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 28, 2023
January 29, 2024
Multiple Locations, East Fayetteville, NC
Related To This Project
East Fayetteville, NC
Bid Date: Jan 11 2024
East Fayetteville, NC
--
East Fayetteville, NC
Bid Date: Feb 15 2024
East Fayetteville, NC
Bid Date: Jan 12 2024
East Fayetteville, NC
Bid Date: Dec 13 2024
East Fayetteville, NC
Bid Date: Jan 12 2024
East Fayetteville, NC
Bid Date: Feb 06 2024
East Fayetteville, NC
Bid Date: Jan 25 2024
East Fayetteville, NC
Bid Date: Dec 21 2023
East Fayetteville, NC
--
East Fayetteville, NC
--
East Fayetteville, NC
Bid Date: Dec 01 2023
East Fayetteville, NC
Bid Date: Feb 08 2024
East Fayetteville, NC
--
East Fayetteville, NC
Bid Date: Nov 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.