EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2024 at 8:00 PM

Updated March 12, 2024

Site work for a water / sewer project in Hackensack, New Jersey. Completed plans call for site work for a water / sewer project.

*As of March 11, 2024, no award, Anticipated award is March 19, 2024** Bids shall be made on the forms provided and made part of the Contract Documents, which SHALL be submitted in TRIPLICATE, One Stamped Original, and Two Stamped Copies. A certified check or cashier's check made payable to the order of the City of Hackensack, or a duly executed Bid Bond, in the amount of ten percent (10%) of each Bid, but in no case in excess of $20,000.00 must be deposited by the Bidder together with a Surety Consent evidencing that they can obtain the required Performance Bond. All applicable Surety Bonds required in connection with the advertisement and award of building Contracts or Sub Agreements must be written by a Surety Company listed on the Federal Treasury List (Department Circular 570 - Surety Companies Acceptable on Federal Bonds), incorporated herein by reference. Copies of this Document may be obtained from the Department. The Successful Bidder shall be required to deliver to the Owner an executed Performance Bond and Payment Bond of a responsible indemnity company authorized to do business in the State of New Jersey. This Project is subject to both Davis Bacon Wage Rate requirements and New Jersey Prevailing wage rate requirements. The Contractor shall utilize the higher of the two rates in each and every category of work on the Project. This Project is expected to be funded in part by the New Jersey Department of Environmental Protection (NJDEP) and New Jersey Environmental Infrastructure Trust (NJEIT). Neither the State of New Jersey, the NJEIT nor any of their departments, agencies or employees is, or will be, a party to this Contract or Subcontract. All Federal Prevailing Wage regulations as well as the Federal Labor Standards Provisions will apply. Attention is called to the fact that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, creed, color, sex or national origin and to the greatest extent possible, opportunities for training and employment shall be given to Lower-Income Residents of the Project area and that, when possible, Contracts shall be awarded to business concerns owned by area Residents. Small, Minority and Women's Business Enterprises are encouraged to submit Bids. Bids for Proposals in excess of $100,000.00 must be accompanied by a written Affirmative Action Plan. Bidders are required to comply with the requirements of P.L. 1975, c. 127. In accordance with the provisions of N.J.S.A. 58:11B-26, N.J.A.C. 7:22-3.17(a)24 and 4.17(a)24, the Contractor (Subcontractor) shall comply with all the provisions of N.J.A.C. 7:22- 9.1 et seq. for the participation of small business enterprises owned and controlled by socially and economically disadvantaged individuals (SEDs). The Successful Bidder for the Project shall commit to the use of small business concerns owned and controlled by SEDs with a goal of ten percent (10%) of the work value under the Contract. All Contractors, including SED Contractors, shall submit their own SED Utilization Plan to the NJDEP OEOPCA, with a copy to the Owner, within thirty (30) days of the Contract award. The Contractor's plan shall contain provisions to meet the specific SED Utilization requirements of the Contract. The Contractor's plan shall outline the entire Project or Contract work, the estimated time to complete the work, each significant segment of work on which SEDs will or may participate and a description of how SEDs will be contacted. The Contractor shall submit SED Participation Monthly Progress Reports (Form OEO-003) to the Project Compliance Officer and shall submit SED Participation Building Phase Quarterly Reports (Form OEO-002) to the Project Compliance Officer and to the OEOPCA, in accordance with N.J.A.C. 7:22-9.12. The City of Hackensack reserves the right to consider Bids for sixty (60) days after their receipt. The right is reserved to waive any informalities, to accept Bids which it deems most favorable to the interest of the City to make an award on each item separately or as a whole and to accept any Bid or to reject any or all Proposals in accordance with the Specifications and the Bid forms The Contract will allow 45 calendar days for completion of the work from the Notice to Proceed.

Bid Results

Water / Sewer

$299,500.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Plugging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
443
Active Projects
225
Bidding Soon
5,090
All Active Projects
2,083
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2024

February 16, 2024

img_map_placeholder

Multiple Locations, Hackensack, NJ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.