Site work for a water / sewer project in Tupelo, Mississippi. Completed plans call for site work for a water / sewer project.

TUPELO -- Lee County officials continue to push for upgrades to Turner Industrial Park, which will see its expansion with a recent bid to upgrade drainage around the railroad crossing within the corridor. The Lee County Board of Supervisors voted unanimously to approve a $248,920 contract with Pontotoc-based Patton Construction Company LLC for water and sewer project along Turner Industrial Park in Saltillo meant to ease flooding issues in the area. The scope of the project focuses on the replacement of a box culvert along Turner Industrial Park and its intersection with the railroad, a Kansas City Southern railroad line. Funding for the project comes from $1 million allocated by the state Legislature last year as part of the overall expansion. County Administrator Ronnie Bell said the project will take strategic coordination with the railroad company as the culvert will be installed under existing railroad spurs which tie the track to WestRock Tupelo. The project will require the spur to be closed for at least five days. The tracks will need to be removed, shutting off rail access for WestRock. Once the culvert is installed, Kansas City Southern will have to rebuild the railroad bed and lay new tracks along the spur. "It is a very unusual project," Bell said. "It is going to be a bit of a hat trick... You've got commerce that still needs to happen across that spur. (It is) going to take some coordination and some help from above for some dry weather." Tupelo-based Engineering Solutions Inc. handled engineering work for the project. The area has a history of flooding during heavy rains. Water drains down into a nearby subdivision through a ditch that runs alongside the tracks, ending at Sand Creek. The new culvert will be larger, allowing for more water to flow through the ditch and under the railroad spur. -------------------------------------------------------------------------------------------------------- The removal of existing corrugated metal pipes and the installation of a restrained joint 10'x5' pre-cast box culvert and aprons. Bids will be received for a single prime Contract. Bids shall be priced per the pay items as indicated in the Bid Form. Each bid submitted must be marked on the outside "Bid for: TURNER PARK CPKC RAIL SPUR DRAINAGE IMPROVEMENTS" A satisfactory Bid Bond executed by the Bidder or an accepted Surety, a certified check, or bank draft payable to the LEE COUNTY BOARD OF SUPERVISORS, on negotiable U.S. Government Bonds (at par value), shall be submitted with each bid in an amount equal to five percent (5%) of the total bid.

Award

Water / Sewer

$600,000.00

Public - County

Site Work

8

9

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
21
Bidding Soon
326
All Active Projects
146
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2024

February 8, 2024

img_map_placeholder

To Be Determined, Tupelo, MS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.