BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Colby, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; bridge / tunnel; water / sewer project; and bridge / tunnel.

20240109020. 1620-01-62 WISC 2024125 Marshfield - Abbotsford, STH 98 to South Junction CTH N, STH 013 Marathon County 1620-01-63 WISC 2024126 Regionwide Concrete Overlays, Marathon Co B-37-0184, B-37-0185, STH 013 Marathon County Work Summary: Grading, Base, Concrete Pavement, Concrete Pavement Repair, Pulverize and Relay, Asphalt Pavement, Diamond Grinding, Bridge Deck Overlays, Curb and Gutter, Sidewalk, Guardrail, Signs, Pavement Markings Work Type: A DBE Goal: 5% Guaranty Required: $ 75,000 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than ten business days prior to the time set for submitting bidding proposals on a form furnished by the Department. Working Day Contract: 110 Days WI DOT - 020 - Marshfield - Abbotsford

Award

Roads / Highways

$8,690,842.00

Public - State/Provincial

Paving, Site Work

386

7

3

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
15
Bidding Soon
169
All Active Projects
73
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2024

February 8, 2024

img_map_placeholder

State Hwy 13, Colby, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.