BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Jackson, Mississippi. Completed plans call for the renovation of a educational facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Jackson Public School District - Bond Construction Program Phase I Restrooms and Locker Rooms Renovation - Murrah High School P.E. CLASSROOM AND VISITING TEAM ROOM RENOVATION Demolition of existing tile, plumbing and electrical fixtures, ceilings, and restroom accessories. The new design revises layout as required, and provides new finishes, ceilings, skylights, exterior enclosure, partitions, fixtures, and accessories; including ADA compliance for each public restrooms. For P.E. classrooms, visiting team room and restrooms, selective demolition requires slab and CMU patching, see drawings for extent. WINDOW REMOVAL AND REPLACEMENT Demolition of existing windows and replacement with storefront or curtain wall system. See drawings for application. HVAC UPGRADE & SERVICE AT ALL UNITS KITCHEN PLUMBING/FINISHES Excavation and partial demolition of CMU wall for access to crawl space. Trenching of crawlspace for access to demolition, removal, and replacement of existing sewer piping below the kitchen, replacement of grease interceptor, and sewer line through the courtyard Infill CMU and regrade. Remove and replace tile flooring and tile walls in kitchen and surrounding rooms, see drawings for extent. Appliances will be stored and reinstalled or replaced by owner. Clean and replace ceiling tiles in kitchen and surrounding areas as needed, see drawings for extent. Bid Alternates 1. Ado Alternate #1: Remove and Replace Windows, Add Sunshades, Add All Work Labor, Materials, Equipment Services, Overhead and Profit Necessary to Remove Existing Windows and Replace With a Storefront Bystem and Sunshade System 2. Ado Alternate #2: Remove and Replace Cafeteria Flooring, Remove and Replace the Existing Vct Flooring and Rubber Wall Base

Award

Educational

$2,600,000.00

Public - County

Paving, Renovation, Site Work

59

28

42

14

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
20
Bidding Soon
229
All Active Projects
103
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

March 15, 2024

img_map_placeholder

1400 Murrah Dr, Jackson, MS


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.