BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 11, 2024 at 7:00 PM

Updated January 29, 2024

Renovation of a conference / convention center in Boston, Massachusetts. Completed plans call for the renovation of a conference / convention center.

**As of January 11, 2024, this project has not yet been awarded. A timeline for award has not yet been established.** The MCCA will receive sealed bids from general contractors for the BCEC, Hynes Convention Center, and Boston Common Garage Elevator and Escalator Maintenance and Repairs Contract. SCOPE OF WORK A. The work to be performed by the Escalator Contractor under the specification shall consist of furnishing all material, labor, supervision, tools, supplies and other expenses necessary to provide full and complete preventative maintenance services, and repairs of every description, including inspections, adjustments, tests and part replacements for the fifty-two (52) escalators covered under this contract. The intent of these specifications is to provide a preventive maintenance service program complete in every respect, for a term of three (3) years. It is not intended to give every detail in specifications. The Contractor will furnish all material, equipment and labor to complete this contract. B. It shall be the responsibility of the Contractor to provide the Authority's representative with prompt written and email notice of any adjustments, repairs or replacements whose costs are not covered by this Contract, so that the Authority may timely take such steps as it deems prudent, in reliance on the information provided by the Contractor, to (1) authorize the Contractor or another contractor to make such adjustments, repairs, or replacements on a temporary or emergency basis; (2) solicit competitive bids or proposals for the work; (3) arrange for details if needed; and/or (4) take other precautions SCHEDULE OF ESCALATORS COVERED UNDER THIS CONTRACT* Boston Convention and Exhibition Center, 415 Summer Street, Boston, MA 02210 Hynes Convention Center, 900 Boylston Street, Boston, MA 02115 Question Deadline 12/21/2023 at 5:00 PM ET MBE (10%), WBE (10%)

Bid Results

Conference / Convention Centers

$3,379,427.00

Public - State/Provincial

Renovation

3

15

2

9

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
530
Active Projects
247
Bidding Soon
3,611
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2024

February 1, 2024

Project location map

Multiple Locations, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.