BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2024 at 7:00 PM

Updated January 29, 2024

Renovation of an educational facility in Boston, Massachusetts. Completed plans call for the renovation of a educational facility.

Match Public Charter High School Boiler Replacement. The Contractor will furnish at his own proper cost and expense all labor, ancillary equipment and materials required for the Match Public Charter High School Boiler replacement installation project for the Match Public Charter School, as described in these Contract Documents. Technical questions regarding this bid should be directed in writing to BLW Engineers by email to Ken Beck at kbeck@blwengineers.com. All technical inquiries must be received no later than December 13, 2023 at 5:00 PM and answers to all technical questions will be sent out to all plan holders of record no later than December 15, 2023 at 10:00A.M. The work to be done under this contract consists of the following: 1. Match Public Charter High School: a. Contractor shall visit the site prior to commencement of work to coordinate work with Match Public High Charter School. b. Painting: Painting of boiler room including all interior walls, ceiling, floor, doors, frames, railings, etc. c. Plumbing: Remove existing domestic hot water heaters and plumbing piping indicated; provide new gas piping to new gas utilization equipment from new gas service, new gas vents, new gas fired condensing type new domestic hot water heater, new domestic coldwater piping, domestic hot water piping, domestic recirculated piping including new recirculation pumps, new reduced pressure backflow preventer, protected water piping to boilers, piping insulation, controls and appurtenances. d. Heating: 1. Removal of existing gas-fired hot water boilers, associated piping, circulating pumps, electrical and automatic controls. 2. Installation of high efficiency gas fired condensing type boilers, circulating pumps, water specialties, insulation, associated piping, controls and appurtenances. e. Electrical: Electrically disconnect all mechanical equipment indicated to be removed, new power wiring to new mechanical equipment and new lighting.

Award

Educational

$290,809.00

Public - County

Renovation

10

13

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
682
Active Projects
351
Bidding Soon
3,698
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2023

May 1, 2024

Project location map

1001 Commonwealth Ave, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.