Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Demolition, site work, paving and new construction of a civil project in Greens Fork, Indiana. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

As of April 29, 2025, this project is now under construction. Question Deadline 01/09/2025 at 3:00 PM ET Submit to INDOT Authorized Representative Jeff Clanton, PE Director Major Project Delivery Indiana Department of Transportation 100 North Senate Ave., Room N758-MPD Indianapolis, IN 46204 Phone: (317) 504-1873 E-mail: jclanton@indot.in.gov Terracon Project No. CJ215541 Project Control No. 2002424, 2002426, 2002427, 2002428, 2002429, 2002430, 2002431, 2002432, 2002433, 2002434, 2002567, 2002575, 2200762, 2200763 Federal/State No. 2002424, 2002426, 2002427, 2002428, 2002429, 2002430, 2002431, 2002432, 2002433, 2002434, 2002567, 2002575, 2200762, 2200763 Location Added Travel Lane and Road Reconstruction Wayne County - on I-70 From 1.4 Mi W of Sr 1 to 0.31 Mi W of Centerville Rd (Rp 135+9600 to 145+0000) Replace Superstructure I70-136-05252 Steel Beam Wayne County - on I-70w Over Whitewater River Overflow, 1.14 Mi W of Sr 1 (Rp 136+0020) Bridge Thin Deck Overlay I70-139-04969 Composite Continuous Steel Beam Wayne County - on I-70w Over Martindale Creek, 0.49 Mile East of Sr 1 (Rp 137+0086) Bridge Deck Overlay I70-139-04970 Composite Continuous Steel Beam Wayne County - on I-70e Over Jacksonburg Road, 2.07 Miles East of Sr 1 (Rp 139+0041) Bridge Deck Overlay I70-139-04970 Composite Continuous Steel Beam Wayne County - on I-70w Over Jacksonburg Road, 2.07 Miles East of Sr 1 (Rp 139+0041) Replace Superstructure I70-139-04971 Continuous Prestressed Concrete Box Beam Wayne County - on I-70e Over Plum Creek, 2.42 Miles East Of Sr 1 (Rp 139+0078) Replace Superstructure I70-139-04971 Continuous Prestressed Concrete Box Beam Wayne County - on I-70w Over Plum Creek, 2.42 Miles East Of Sr 1 (Rp 139+0078) Bridge Deck Overlay I70-141-04972 Composite Continuous Steel Beam Wayne County - on I-70e Over Greens Fork, 3.81 Miles East Of Sr 1 (Rp 141+0014) Bridge Deck Overlay I70-141-04972 Composite Continuous Steel Beam Wayne County - on I-70w Over Greens Fork, 3.81 Miles East of Sr 1 (Rp 141+0014) Replace Superstructure I70-136-05252 Steel Beam Wayne County - on I-70e Over Whitewater River Overflow, 1.14 Mi W of Sr 1 (Rp 136+0020) Bridge Thin Deck Overlay I70-139-04969 Composite Continuous Steel Beam Wayne County - on I-70e Over Martindale Creek, 0.49 Mile East of Sr 1 (Rp 137+0086) Replace Superstructure I70-141-04973 Composite Continuous Steel Beam Wayne County - on Washington Road Over I-70, 3.94 Miles East of Sr 1 (Rp 141+0028) Replace Superstructure I70-136-05159 Composite Continuous Steel Beam Wayne County - on I-70e Over Whitewater River, 1.28 Miles West of Sr 1 (Rp 136+0006) Replace Superstructure I70-136-05159 Composite Continuous Steel Beam Wayne County - on I-70w Over Whitewater River, 1.28 Miles West of Sr 1 (Rp 136+0006) DBE Goal: 10.00 Completion Date July 01, 2029 Qualifications: B(A) C(A) D(A) An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Engineer by the time set for receipt of proposal bids. INDOT - Call 340 - Pavement Rehabilitation, Road and Bridge Improvements

Under Construction

Roads / Highways

$162,305,009.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

62

18

55

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
70
Bidding Soon
1,931
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.