Published December 12, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Macomb, Illinois. Completed plans call for the renovation of a municipal facility.

The project replaces indoor primary service entrance switches and oil filled link boxes, replaces aged building transformers and switchboards, replaces primary link boxes in manholes with modular splices or new pad mounted switches, replaces sections of primary distribution cabling, builds new manholes/structures around existing duct banks, provides three new outdoor emergency generators, and provides low voltage distribution as required. ELECTRICAL - Under $3,500,000 No faxed bid modifications will be allowed. No In-Person submittals of bids will be allowed. Bids and bid modifications will not be allowed via mail. In the event that the bidder experiences technical errors uploading and submitting its bid or bid modification into the system, the bidder must submit a screenshot of the error it receives to CDB.CPO@illinois.gov prior to the bidding deadline. Once the error has been submitted, a vendor will be provided detailed instructions on submitting its bid or bid modification via an alternative file transfer system. CDB will evaluate the information provided in the email and, in consultation with the CPO's office, determine if the bid should be accepted or rejected. Meeting participants will not be able to ask questions either verbally or via the meeting's chat feature. Minority, Women, Persons with Disabilities, and Veteran Business Subcontractor/Supplier Participation is Applicable. Bidders must be prequalified with CDB; allow 45 days for application processing. MBE/WBE/PBE/VBE firms must be certified or registered with the State of Illinois Commission on Equity and Inclusion as an MBE, WBE, PBE, or VBE prior to bidding. C. Prevailing Wage. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Prevailing Wage Act (820 ILCS 130/1-12). D. Registration with the Illinois Procurement Gateway (IPG). All new and renewing vendors that request either Architect/Engineer, Construction Manager/Program Manager, or Contractor prequalification must be an "Active (Accepted)" registrant in the IPG. Vendors not subject to prequalification renewal prior to time of bid may pre- register with the IPG and receive a vendor registration number. The IPG is a web based system that serves as the primary location for entering, organizing, and reviewing vendor information. The IPG allows prospective vendors to provide disclosures, registrations, and other documentation needed to do business with the State in advance of any particular procurement. E. Certifications and Disclosures. New vendors and vendors renewing prequalification must have an approved Illinois Procurement Gateway registration number and completed Form B. Vendors not subject to prequalification renewal prior to time of bid have the option to submit the Standard Certifications and Disclosure Form(s) (Form A) with bid at time of submittal. Failure to provide a completed Form A standard certifications and financial disclosure or Form B, will result in rejection of bid. F. Subcontractors. You are also required to submit disclosure forms and standard certifications for subcontractors not considered incidental to the performance of the contract with an annual value over $100,000 within 20 days of execution of your contract with CDB or execution of the contract between you and your subcontractor, whichever is later. A valid IPG registration number can be provided in lieu of hard copies of the standard certifications and financial disclosure forms. (See D. above.) Subcontractors must receive an Authorization to Proceed prior to performance of any work. G. Supplement to SDC. Bidders are advised to review Article 01 11 01, Supplement to SDC, for any revisions to the Standard Documents for Construction. H. Progress Payments. Progress payments will normally be issued by the Illinois Comptroller within 30 business days after CDB receives and approves an Invoice-Voucher. I. Bid Protest. Bidder may submit a written protest to the Protest Review Office following the requirements of the Administrative Rules, 44 Ill. Adm. Code 8.2075. For protests related to specifications, the Protest Review Office must physically receive the protest no later than fourteen (14) days after solicitation or related addendum was posted to the Bulletin. For protest related to rejection of individual bids or awards, the protest must be received by close of business no later than fourteen (14) days after the protesting party knows or should have known of the facts giving rise to the protest. Questions due date by 10:00 AM on Monday December 4, 2023.

Post-Bid

Municipal

$3,500,000.00

Public - State/Provincial

Renovation

67

20

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Maintenance Data, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Water Repellents, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Other Conveying Equipment, Facility Chutes
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Overcurrent Protective Device Coordination Study, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Shoring and Underpinning, Concrete Raising, Pressure Grouting
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Pruning, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
24
Bidding Soon
378
All Active Projects
218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2023

February 12, 2024

img_map_placeholder

1 University Cir, Macomb, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Upgrade Electrical Distribution System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.