BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Chicago, Illinois. Contact the soliciting agency for additional information.

The term of the Master Construction Services Contract will be 5 years, plus a 2-year extension option. Each Task Order will expire upon project completion and acceptance. Task Orders must be approved and executed prior to expiration of the Master Construction Services Contract. All terms and conditions in the Master Construction Services Contract will apply to any executed Task Orders, including but not limited to bonding and insurance requirements. The MPEA seeks experienced and qualified construction companies to enter into a "Master Construction Services Contract" to perform work on a Task Order basis, with the ability to begin work within the specified time schedule in each Task Order request. The MPEA seeks to award up to five (5) Master Construction Services Contracts in each of the following groups: General Contractor, Mechanical Contractor, and Electrical Contractor. Task Order requests will be issued to all contractors within the relevant group and awarded to the lowest responsive bidder for that Task Order. The scope of work will be determined on a project-by-project basis, but generally will be for projects that cannot be performed in-house by MPEA but falls short of larger planned expansion and construction projects that need to go through a formal design-build or design-bidbuild procurement process. Contractors will be responsible for all work within the scope of a Task Order, whether performed through its own forces, or through subcontractors. The contractor shall subcontract only with competent and responsible subcontractors. The MPEA reserves the right to approve all subcontractors at time of task order proposal submission. Contractor shall not replace any subcontractor or add or remove subcontractors without the prior written consent of the Director of Procurement of the MPEA. Such consent by the MPEA shall not be unreasonably withheld. For projects issued to the companies under the General Contractor group, the companies awarded Mechanical and Electrical contracts pursuant to this RFQ will be considered "prequalified". Contractor shall provide all equipment, fuel, labor, materials, transportation, trucks, vehicles, and any/all other services necessary to complete the scope of each project in accordance with the terms and conditions of its Master Construction Services Contract and each Task Order request issued. All services and materials shall be of the highest and best quality, competitively priced, and delivered and performed in a timely manner. Contractor must have the ability to perform limited design and engineering work as required by the Task Order scope, including any necessary licenses or professional certifications. Contractor is responsible for coordinating all disciplines, meeting minutes, schedule updates, obtaining needed permits, submittals and final as-builts for any projects completed. Pre-qualification is not a guarantee of work. Throughout the Contract Term, when the need for services arises, the MPEA may issue a project-specific Task Order request to the pre-qualified contractors in the relevant group per this RFQ, issue a separate Invitation for Bids, or perform work with MPEA staff. Additionally, each Task Order will be awarded to the lowest bidder from the prequalified Rapid Response Construction Group. For the RFQ submission, respondents are not required to submit completed Form I Special Conditions. For each Task Order request, Contractors are required to submit a compliance plan that includes 25% MBE and 5% WBE participation on each project. If it becomes necessary to revise or amend any part of this RFQ, including the due dates, the Authority will publish a revision by written addendum on its website and notify all prospective Respondents who have registered as a document holder and provided the Authority with valid contact information. It will be the responsibility of the Respondent to obtain all such addenda and to acknowledge receipt of any addenda that have been issued. (If none are issued, indicate "NONE" on REQUIRED FORM A, Form of Transmittal Letter.) Respondents are to contact only the MPEA Procurement Department, at mpeaprocurement@mpea.com concerning this RFQ and should not rely on representations, statements, or explanations other than those made in this RFQ or in any written addendum to this RFQ. At this time MPEA is suspending receipt of hardcopies. Based on the responses submitted, the Authority may select a short list of Respondents for further consideration and may elect to conduct oral interviews with short-listed Respondents. The responsibility for submitting a response to this RFQ on or before the stated time and date will be solely and strictly that of the Respondent. The Authority will in no way be responsible for delays caused by any other entity or by any occurrence. By submitting Qualifications, Respondent agrees to accept and abide by the terms of this RFQ. The Authority reserves the right to reject any or all submittals, to waive any informality or irregularity, and to accept any responsive submittals which it may deem to be in the best interest of the Authority. Only submittals from responsible Respondents complying with the provisions of this RFQ will be considered. The Authority will accept questions, in writing via e-mail, until 12:00 PM central time on Thursday, December 14, 2023. Questions should be submitted in writing to mpeaprocurement@mpea.com. A summary of questions received, noted without source, and answers will be issued as an addendum on the MPEA procurement website.

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
123
Bidding Soon
1,807
All Active Projects
806
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2024

February 8, 2024

img_map_placeholder

Multiple Locations, Chicago, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.