Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Chicago, Illinois. Contact the soliciting agency for additional information.
The term of the Master Construction Services Contract will be 5 years, plus a 2-year extension option. Each Task Order will expire upon project completion and acceptance. Task Orders must be approved and executed prior to expiration of the Master Construction Services Contract. All terms and conditions in the Master Construction Services Contract will apply to any executed Task Orders, including but not limited to bonding and insurance requirements. The MPEA seeks experienced and qualified construction companies to enter into a "Master Construction Services Contract" to perform work on a Task Order basis, with the ability to begin work within the specified time schedule in each Task Order request. The MPEA seeks to award up to five (5) Master Construction Services Contracts in each of the following groups: General Contractor, Mechanical Contractor, and Electrical Contractor. Task Order requests will be issued to all contractors within the relevant group and awarded to the lowest responsive bidder for that Task Order. The scope of work will be determined on a project-by-project basis, but generally will be for projects that cannot be performed in-house by MPEA but falls short of larger planned expansion and construction projects that need to go through a formal design-build or design-bidbuild procurement process. Contractors will be responsible for all work within the scope of a Task Order, whether performed through its own forces, or through subcontractors. The contractor shall subcontract only with competent and responsible subcontractors. The MPEA reserves the right to approve all subcontractors at time of task order proposal submission. Contractor shall not replace any subcontractor or add or remove subcontractors without the prior written consent of the Director of Procurement of the MPEA. Such consent by the MPEA shall not be unreasonably withheld. For projects issued to the companies under the General Contractor group, the companies awarded Mechanical and Electrical contracts pursuant to this RFQ will be considered "prequalified". Contractor shall provide all equipment, fuel, labor, materials, transportation, trucks, vehicles, and any/all other services necessary to complete the scope of each project in accordance with the terms and conditions of its Master Construction Services Contract and each Task Order request issued. All services and materials shall be of the highest and best quality, competitively priced, and delivered and performed in a timely manner. Contractor must have the ability to perform limited design and engineering work as required by the Task Order scope, including any necessary licenses or professional certifications. Contractor is responsible for coordinating all disciplines, meeting minutes, schedule updates, obtaining needed permits, submittals and final as-builts for any projects completed. Pre-qualification is not a guarantee of work. Throughout the Contract Term, when the need for services arises, the MPEA may issue a project-specific Task Order request to the pre-qualified contractors in the relevant group per this RFQ, issue a separate Invitation for Bids, or perform work with MPEA staff. Additionally, each Task Order will be awarded to the lowest bidder from the prequalified Rapid Response Construction Group. For the RFQ submission, respondents are not required to submit completed Form I Special Conditions. For each Task Order request, Contractors are required to submit a compliance plan that includes 25% MBE and 5% WBE participation on each project. If it becomes necessary to revise or amend any part of this RFQ, including the due dates, the Authority will publish a revision by written addendum on its website and notify all prospective Respondents who have registered as a document holder and provided the Authority with valid contact information. It will be the responsibility of the Respondent to obtain all such addenda and to acknowledge receipt of any addenda that have been issued. (If none are issued, indicate "NONE" on REQUIRED FORM A, Form of Transmittal Letter.) Respondents are to contact only the MPEA Procurement Department, at mpeaprocurement@mpea.com concerning this RFQ and should not rely on representations, statements, or explanations other than those made in this RFQ or in any written addendum to this RFQ. At this time MPEA is suspending receipt of hardcopies. Based on the responses submitted, the Authority may select a short list of Respondents for further consideration and may elect to conduct oral interviews with short-listed Respondents. The responsibility for submitting a response to this RFQ on or before the stated time and date will be solely and strictly that of the Respondent. The Authority will in no way be responsible for delays caused by any other entity or by any occurrence. By submitting Qualifications, Respondent agrees to accept and abide by the terms of this RFQ. The Authority reserves the right to reject any or all submittals, to waive any informality or irregularity, and to accept any responsive submittals which it may deem to be in the best interest of the Authority. Only submittals from responsible Respondents complying with the provisions of this RFQ will be considered. The Authority will accept questions, in writing via e-mail, until 12:00 PM central time on Thursday, December 14, 2023. Questions should be submitted in writing to mpeaprocurement@mpea.com. A summary of questions received, noted without source, and answers will be issued as an addendum on the MPEA procurement website.
Post-Bid
Municipal
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 8, 2024
February 8, 2024
Multiple Locations, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Dec 28 2023
Chicago, IL
Bid Date: Dec 18 2023
Chicago, IL
Bid Date: Jan 11 2024
Chicago, IL
Bid Date: Jan 18 2024
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Dec 19 2023
Chicago, IL
Bid Date: Dec 14 2023
Chicago, IL
Bid Date: Dec 21 2023
Chicago, IL
Bid Date: Jan 09 2024
Chicago, IL
--
Chicago, IL
Bid Date: Dec 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.