BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, renovation and addition to a fire / police facility in Morgan Hill, California. Completed plans call for the addition of a 6,080-square-foot fire / police facility; for the demolition of a fire / police facility; for the renovation of a fire / police facility; and for site work for a fire / police facility.

Location and Description. The Project is located at 16200 Vineyard Boulevard Morgan Hill, CA 95037, and is described as follows: The project scope will include minor demolition of non-structural walls to provide access to the new proposed office area. Work will also include necessary electrical, HVAC, concrete flat work outside of building, and other miscellaneous work associated with tenant improvements. Contractor and all staff working at the police station will be required to complete a California DOJ fingerprint exam and criminal history check prior to being allowed on site. Those individuals with felony convictions and or recent disqualifying misdemeanor convictions will not be allowed to work on the police station premises. the purpose of the project is to expand the existing police department into the adjacent suite 100 at 162000 vineyard blvd. in morgan hill, ca. the project scope will include minor demolition of non-structural walls to provide access to the new office area. electrical work shall include adding suite 100 and 150 to the existing back up generator (transfer 480 feeder to distribution panel); addition/relocation of convenience outlets; and replacement of (3) 2x4 fixtures with (4) 2x2 fixtures in expanded work area. all other lighting to remain. there will be: no change of building use . no change to existing parking layout . no change to existing landscaping . no change to existing exterior signage . no change to existing building exterior . no new rooftop units . new site improvements for disabled access compliance . selective demolition of (e) non-load bearing walls . new non-load bearing, non-rated walls . no change to existing lighting . modification existing electrical emergency power . minor modification to existing hvac supply and return grilles as required for new layout. . no roof-mounted mechanical units accessibility compliance for "path of travel" elements shall be limited to updating site and interior signage and modifying the accessible route from the public way to the building entrance which exceeds 20% of the total cost of the project. all other non compliance items shall be identified and forwarded to the city of morgan hill for inclusion in the title ii entity barrier removal plan. The estimated construction cost is $165,000 Requests for Information. Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to Yat Cho, Project Engineer, at yat.cho@morganhill.ca.gov. Oral responses are not authorized and are not binding on the City. Bidders should submit any such written inquiries at least five Working Days before the scheduled bid opening. Questions received any later might not be addressed before the bid deadline. An interpretation or clarification by City in response to a written inquiry will be issued in an addendum.

Award

Fire / Police

$229,221.00

Public - City

Addition, Demolition, Renovation, Site Work

32

9

4

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
66
Bidding Soon
1,390
All Active Projects
607
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2024

March 1, 2024

img_map_placeholder

16200 Vineyard Blvd, Morgan Hill, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.