BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Fort Laramie, Wyoming. Completed plans call for site work for a bridge / tunnel.

Est. Completion Date: Dec. 31, 2026 Question Deadline 01/05/2024 The scope of the CMAR Contract is summarized as follows: Construction of the Fort Laramie Canal Tunnel 1 and 2, including the four portals to convey a design discharge of 1,532-cfs of irrigation water annually between May through September. Preconstruction services, including but not limited to Value Engineering/Constructability (VEC), risk, time, and cost management from a qualified CMAR. During the preconstruction process the CMAR will have the ability to bid work authorizations for work related to the following potential construction work packages including, but not limited to: Limited Site Preparation Portal Removal and Replacement Tunnel Rehabilitation of Tunnel 1 at 2,699 feet Tunnel Rehabilitation of Tunnel 2 at 2,029 feet The existing project design for tunnel rehabilitation using the sequential excavation method (SEM) recently reached the 30% design milestone for two irrigation tunnels and the associated portals. CMAR shall review the 30% design milestone and prepare a Value Engineering/Constructability (VEC) report that includes cost, time, and risk management. The CMAR shall participate and review each subsequent design milestone and update their report as the design progresses. CMAR shall prepare a Guaranteed Maximum Price (GMP) Proposal and other related tasks as identified in the scope of work. The Owner's main objectives are to construct the project within the funding budget and timeframe and maintain the required supply of irrigation water. Owner will conduct a mandatory Information Conference regarding the CMAR Contract and CMAR selection process. The Information Conference regarding the CMAR Contract and CMAR selection process will be held virtually on December 20, 2023 at 10 am through Teams. Attendance at the Information Conference is required. Please RSVP to each meeting by sending an email to the following email, goshencmar@hdrinc.com. The following link may be used to access the virtual meeting: https://teams.microsoft.com/l/meetupjoin/19%3ameeting_N2UzYjlhNDktZDg5YS00MDhhLWI0ODEtYzBmNWYyZTBiMGRl%40thre ad.v2/0context=%7b%22Tid%22%3a%223667e201-cbdc-48b3-9b42- 5d2d3f16e2a9%22%2c%22Oid%22%3a%22c43ad1da-e309-4405-a66eb07acbe5935c%22%7d

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - County

Site Work

6

14

21

10

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
8
Bidding Soon
95
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

January 30, 2024

img_map_placeholder

Multiple Locations, Fort Laramie, WY

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.