Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Folkston, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The construction of +-60 LF of 30 storm drain pipe, two 30 storm drain flared end sections, +- 0.24 miles of base and paving, including +- 2,796 SY of 8 graded aggregate base course, +- 754 tons of 12.5mm Superpave, striping, 0.24 LM of grading, and all appurtenances necessary for a complete job. All work on the Project must be completed within 210 consecutive calendar days of date of notice to proceed. No bid will be considered unless sealed and filed with Charlton County prior to the time set forth above, and accompanied by a Bidder's Bond, payable to the Charlton County for 10 percent of the amount of the bid; to be forfeited as liquidated damages in the event that the bid be accepted and the bidder fail to enter promptly into a written contract and furnish the required Payment Bond and Performance Bond and Insurance Certificates. Bids arriving after the designated time will be returned unopened. No bids shall be withdrawn for a period of 60 days after the opening of bids. Charlton County, reserves the right to reject any or all bids and to overlook and/or disregard informalities or irregularities in the proposals. The construction of 60 LF of 30 storm drain pipe, two 30 storm drain flared end sections, 0.24 miles of base and paving, including 2,796 SY of 8 graded aggregate base course, 754 tons of 12.5mm Superpave, striping, 0.24 LM of grading, and all appurtenances necessary for a complete job.
Bid Results
Water / Sewer
$205,348.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 10, 2024
March 11, 2024
Briarwood Rd, Folkston, GA
Related To This Project
Folkston, GA
Bid Date: Mar 29 2024
Folkston, GA
Bid Date: Mar 28 2024
Folkston, GA
--
Folkston, GA
Bid Date: Aug 23 2024
Folkston, GA
Bid Date: Oct 15 2024
Folkston, GA
Bid Date: Jan 10 2024
Folkston, GA
Bid Date: Jan 10 2024
Folkston, GA
--
Folkston, GA
Bid Date: Oct 09 2023
Folkston, GA
Bid Date: Aug 21 2020
Folkston, GA
Bid Date: Jul 21 2021
Folkston, GA
Bid Date: Apr 24 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.