BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Reno, Nevada. Completed plans call for the renovation of a detention facility.

Upgrade of the existing door controls, communication, and integration of security camera systems at Jan Evans Detention Center. The upgrades to the door controls include software, firmware, programmable logic controllers (PLCs) and the intercom system. Project Identification: PWP-WA-2024-084 includes but is not limited to, all material, labor, tools, expendable equipment, utility and transportation service, any and all travel expenses (previously approved by County), and all incidental items necessary to perform and complete the required Scope of Work in a workmanlike manner, complete and on schedule. Generally speaking this project will be broken up into different phases: 1. offsite fabrication and 2. Onsite construction. 1. Offsite fabrication will include but not limited to the procurement of all materials necessary for the full scope of work, electrical back panel fabricating, programming, testing and initial training. Reference Exhibit E - Jan Evans Security Control Upgrade - CD Specifications for more details. 2. Onsite construction - project location is 650 Ferrari McLeod Blvd, Reno, NV 8951 Generally speaking the scope will include but not limited to the upgrade of the existing door controls, communication, and integration of security camera systems at Jan Evans Detention Center. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. Location: 650 Ferrari McLeod Blvd, Reno, NV 89512 Approximate Construction Start Date: Tuesday, May 28, 2024 Approximate Construction Duration: 30 Calendar Days For additional information, please contact: Project Manager: Steve Grosz E-Mail: SGrosz@washoecounty.gov Phone: 775-530-2529 All questions, requests for information, and correspondence shall be directed via email to the following CSD Project Manager: Steve Grosz SGrosz@washoecounty.gov Community Services Department, Engineering and Capital Projects Division Question Deadline 01/25/2024 at 2:00 PM PT A Labor & Material Payment Bond and a Performance & Completion Bond, each in an amount equal to one hundred percent (100%) of the total contract sum, shall be provided by the successful contractor in accordance with the forms provided in this package. Said bonds shall be in favor of "County of Washoe, a political subdivision of the State of Nevada".

Post-Bid

Jails / Prisons

$625,000.00

Public - County

Renovation

28

17

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
30
Bidding Soon
495
All Active Projects
226
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 31, 2024

May 28, 2024

img_map_placeholder

650 Ferrari McLeod Blvd, Reno, NV


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.