Renovation of a medical facility in Columbus, Ohio. Conceptual plans call for the renovation of a medical facility.

The Ohio State University Wexner Medical Center is requesting qualifications from interested Architect/Engineer ("A/E") teams to assist in the development of design documents as a continuation of the Doan Hall exterior brick repairs. The proposed work includes the south elevation and a portion of the east elevation at the southeast corner of the building. The primary objectives include: Correcting bowed brick and loose brick locations Infill obsolete AC unit locations with new brick Treatment of steel lintels Applying Elastomeric waterproof coating Installing Exterior Storm Windows Repairs to existing concrete sun-shades The Architect / Engineer ("A/E") will validate the ability to address the items listed above. Swing stage scaffolding will likely be required by the contractor to make the repairs. The design team should be prepared to design roof stanchion that will be permanently installed in the roof to support the scaffolding. Final scope, budget, and a phased construction schedule will be developed and validated during design process by the A/E team. This project will follow the applicable new sustainability standards The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Growth, Diversity & Equity (EDGE) Program as required by statute and the Agreement As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types During the construction period, provide not less than 6 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. The project team (Owner / A/E / Contractor) will be required to utilize e-Builder, the University's Project Management System, for all compatible services required by the University. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors, and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Projects Building Envelope Repairs / Renovations 2. Envelope Projects on Active Acute Care Medical Centers 3. State of Ohio and/or the Ohio State University Projects C. Estimated Budget / Funding State Funding: $0.00 Other Funding: $2,240,000.00 Construction Cost: $1,800,000.00 Total Project Cost: $2,240,000.00 Question Deadline 12/29/2023 Submit all questions regarding this RFQ in writing to Sarah Lively at lively.28@osu.edu with the project number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. D. Anticipated Schedule Professional Services Start: 01/24 Construction Notice to Proceed: 06/24 Substantial Completion of all Work: 07/25 Professional Services Completed: 08/25 F. EDGE Participation Goal Percent of initial Total A/E Fee: 5.0% The lead A/E shall be (1) an architect registered pursuant to ORC Chapter 4703, (2) a landscape architect registered pursuant to ORCChapter 4703, or a (3) professional engineer or (4) professional surveyor licensed pursuant to ORC Chapter 4733. The method of Contractor Selection has not been Determined at this time

Conceptual

Medical

$2,240,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
54
Bidding Soon
1,135
All Active Projects
489
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

img_map_placeholder

410 W 10th Ave, Columbus, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.