Site work for a water / sewer project in New Braunfels, Texas. Completed plans call for site work for a water / sewer project.

Infrastructure Replacement Package 1 - Construction NBU anticipates the following items will be included in the Project scope of work: (i) construction of approximately 2,100 linear feet (LF) of 8-inch wastewater main along Spur Street, South Plum, South Grape, Rosedale Avenue, and adjacent to address 3567 IH 35 North; (ii) removal or abandonment of existing wastewater manholes and mains (iii) stormwater pollution prevention; (iii) removal and reconnection of water services; (iv) traffic control; (v) site restoration ; and (vi) all other appurtenances necessary to complete the Project. The Project will be designed and constructed so as to meet all applicable federal, state, and local accessibility standards. The selected Offeror will be also responsible for obtaining all applicable permits and inspections; providing all necessary performance and payment bonds and insurance requirements; and providing NBU with all manufacturers' warranties and all operations and maintenance (O & M) manuals for all equipment installed. The Project will be located in New Braunfels, TX at the following three sites: 1) Spur Street from South Live Oak Avenue to South Plum Avenue, South Plum Avenue from Spur Street to Cross Street, South Grape Avenue from Spur Street to approximately 550 feet East; 2) Rosedale Avenue from South Krueger Avenue to Rosewood Avenue; and 3) 3567 IH 35 Northbound Access Road. Each bid must be accompanied by an approved Bid Bond in the amount of 5% of the bid cost, payable to NBU without recourse, as a guarantee bidder will enter into a contract at the stated price. The successful bidder must execute 100% performance and payment bonds on the forms provided within ten (10) days after the contract has been awarded. The Bid Bond accompanying the bid of the apparent successful bidder will be retained until the contract is awarded and successful bidder executes the contract and furnishes the required bonds and insurance, after which the Bid Bond will be returned to the bidder. All other Bid Bonds will be returned after the bid award. The estimated maximum construction budget is approximately $1,200,000. This amount includes all incidental and contingent expenses associated with the construction of the Project NBU intends to respond to all questions; however, NBU reserves the right to decline to respond to a question or concern. NBU has established a target commencement date for construction activities of the Project as May 1, 2024. The projected substantial completion date is estimated to be one hundred and fifty (150) calendar days from the Notice to Proceed date. NBU reserves the right to phase the construction of the Project or modify the schedule as needed and determined by the NBU Board or staff due to modifications in scope. Questions regarding this RFB or the services requested must be sent to the Purchasing Manager at purchasing@nbutexas.com. NBU shall accept requests for additional information or clarification concerning this RFB on or before January 11, 2024 at 2:00 PM CST. NBU shall not answer any questions submitted after 2:00 PM CST, January 11, 2024. NBU shall have a reasonable amount of time to respond to questions or concerns regarding the RFB. NBU intends to respond to all questions; however, NBU reserves the right to decline to respond to a question or concern. Bids shall remain open and may be held by NBU for ninety (90) days after the Opening Deadline for full evaluation and ranking of offerors. Based on its sole discretion, NBU reserves the right to determine the propriety of any bid and may disqualify any bidder based on an incomplete, inaccurate, or noncompliant bid. The Board of Trustees of NBU reserves the right to reject any or all of the bids, to waive formalities, and to make an award to an offeror as outlined in this RFB. Bidders will be notified in writing of any determinations made by NBU or its Board of Trustees pursuant to this Section.

Post-Bid

Water / Sewer

$1,200,000.00

Public - City

Site Work

70

13

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
43
Bidding Soon
2,347
All Active Projects
802
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

May 1, 2024

img_map_placeholder

Multiple Locations, New Braunfels, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.