BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Moses Lake, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of March 11, 2024 project was awarded but awarded amount is not available.** The project location is 802 South Division Street. It includes decommissioning existing lift station equipment and materials and installing a new wet well, valve vault, lift station pumps, electrical and telemetry panels, and equipment. 18-inch diameter PVC gravity sewer pipe and 6" ductile iron force main will be installed. Several large holes will be bored in vertical concrete walls. Existing underground wet well, and valve vault structures will be rehabilitated. Other site improvements include the installation of new chain link fence, crushed basalt rock, gravel, sidewalk, and driveway. Traffic control and temporary bypass pumping of wastewater will be required to complete the project. Estimated Project Cost: $750,000 to $1,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. No oral interpretations will be made to any bidder as to the meaning of the specifications and drawings. Interpretations, if made, shall be written in the form of an addendum and sent to all bidders to whom the specifications have been issued.

Award

Water / Sewer

$949,117.00

Public - City

Paving, Site Work

27

7

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
8
Bidding Soon
128
All Active Projects
44
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

April 1, 2024

img_map_placeholder

802 S Division St, Moses Lake, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.