BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2024 at 8:00 PM

Updated March 12, 2024

Site work and paving for a mixed-use development in Moses Lake, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of March 11, 2024 project was awarded but awarded amount is not available.** The project location is 802 South Division Street. It includes decommissioning existing lift station equipment and materials and installing a new wet well, valve vault, lift station pumps, electrical and telemetry panels, and equipment. 18-inch diameter PVC gravity sewer pipe and 6" ductile iron force main will be installed. Several large holes will be bored in vertical concrete walls. Existing underground wet well, and valve vault structures will be rehabilitated. Other site improvements include the installation of new chain link fence, crushed basalt rock, gravel, sidewalk, and driveway. Traffic control and temporary bypass pumping of wastewater will be required to complete the project. Estimated Project Cost: $750,000 to $1,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. No oral interpretations will be made to any bidder as to the meaning of the specifications and drawings. Interpretations, if made, shall be written in the form of an addendum and sent to all bidders to whom the specifications have been issued.

Award

Water / Sewer

$949,117.00

Public - City

Paving, Site Work

27

7

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
16
Bidding Soon
434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

April 1, 2024

Project location map

802 S Division St, Moses Lake, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.