Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Renovation of a fire / police facility in Costa Mesa, California. Completed plans call for the renovation of a 2,288-square-foot fire / police facility.
As of September 19, 2025, this project has begun construction. Information regarding who was awarded is not available. ............................................... The construction cost estimate for this project is approximately $3,000,000 and construction duration is estimated in 180 working days. The construction is anticipated to start in the second trimester of 2024. The project should be completed before the end of 2024. Provide the construction management, special inspection and testing services, for the Fire Station No. 4 - Training Tower Facility Project within construction phase per the project plans attached. This improvement will require coordination with the City of Costa Mesa Building Division through the establishment of a specialized inspection schedule and deputy inspections to different components that include but are not limited to: Concrete slab reinforced steel, footing reinforced steel, stem wall steel and anchor bolt locations, installation of anchors epoxied in concrete, verification of concrete mix design, slump, air content & concrete temperature, concrete placement, bottling inspections. Online Q&A - Yes Q&A Deadline - 12/22/2023 5:00 PM (PST) Bid Bond - 0.00% Payment Bond - 0.00% Performance Bond - 0.00% Project Duration - 180 BUSINESS DAYS Type of Award - Lump Sum License Requirements Special Inspection - California Accreditations
Under Construction
Fire / Police
$300,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 12, 2024
April 8, 2025
2300 Placentia Ave, Costa Mesa, CA
Related To This Project
Costa Mesa, CA
Bid Date: Feb 22 2024
Costa Mesa, CA
Bid Date: Feb 08 2024
Costa Mesa, CA
Bid Date: Jan 18 2024
Costa Mesa, CA
--
Costa Mesa, CA
Bid Date: Jan 15 2024
Costa Mesa, CA
Bid Date: Feb 01 2024
Costa Mesa, CA
Bid Date: Feb 22 2024
Costa Mesa, CA
Bid Date: Apr 03 2020
Costa Mesa, CA
Bid Date: Jun 09 2020
Costa Mesa, CA
Bid Date: Dec 13 2023
Costa Mesa, CA
Bid Date: Nov 24 2023
Costa Mesa, CA
Bid Date: Nov 13 2023
Costa Mesa, CA
Bid Date: Nov 13 2023
Costa Mesa, CA
Bid Date: Dec 12 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
