BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Costa Mesa, California. Working plans call for the renovation of a 2,288-square-foot fire / police facility.

The construction cost estimate for this project is approximately $3,000,000 and construction duration is estimated in 180 working days. The construction is anticipated to start in the second trimester of 2024. The project should be completed before the end of 2024. Provide the construction management, special inspection and testing services, for the Fire Station No. 4 - Training Tower Facility Project within construction phase per the project plans attached. This improvement will require coordination with the City of Costa Mesa Building Division through the establishment of a specialized inspection schedule and deputy inspections to different components that include but are not limited to: Concrete slab reinforced steel, footing reinforced steel, stem wall steel and anchor bolt locations, installation of anchors epoxied in concrete, verification of concrete mix design, slump, air content & concrete temperature, concrete placement, bottling inspections. Online Q&A - Yes Q&A Deadline - 12/22/2023 5:00 PM (PST) Bid Bond - 0.00% Payment Bond - 0.00% Performance Bond - 0.00% Project Duration - 180 BUSINESS DAYS Type of Award - Lump Sum License Requirements Special Inspection - California Accreditations

Final Planning

Fire / Police

$300,000.00

Public - City

Renovation

71

6

8

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
114
Bidding Soon
2,450
All Active Projects
962
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2024

May 13, 2024

img_map_placeholder

2300 Placentia Ave, Costa Mesa, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.