Published August 8, 2024 at 8:00 PM

Updated August 9, 2024

Site work for a water / sewer project in Schertz, Texas. Completed plans call for site work for a water / sewer project.

FM 1518 Utility Relocations The work shall consist of the following: Abandoning of approximately 1,570 LF of existing wastewater line and removal of 646 LF of existing wastewater line, installing approximately 1,631 LF of 18"-30" gravity wastewater lines and appurtenances; 2,218 LF of 3"-12" water lines and appurtenances; 380 LF of bore encasement underneath a driveway and creek crossing, relocation of a CPS Energy power pole, removal and replacement of existing asphalt, removal and replacement of existing curb and gutter, excavation and embankment; erosion and sedimentation control and replacement/repair of irrigation lines, trees and shrubs A Bid Bond, Cashier's Check, or Certified Check in the amount of five percent (5%) of the Bid must accompany each bid in accordance with instructions to bidders. Performance and Payment Bonds will be required as stated in the Contract Documents. The prices and terms of the bid must be made on the forms included in the Contract Documents. The Owner may, on its own initiative, issue Addenda before the Bid opening and, if necessary, delay the Bid opening to ensure that bidders have had sufficient time to consider the Addenda. A Bid which, in the opinion of the Owner, deviates significantly from the Contract Documents, and which has not been clarified through a written Addendum prior to Bid submittal deadline, shall be considered an exception to the Contract Documents and grounds for the Bid to be rejected. Bidders should read and understand all terms and conditions contained in these Contract Documents. The prices and terms of the bid must be made on the forms included in the Contract Documents. The Owner may, on its own initiative, issue Addenda before the Bid opening and, if necessary, delay the Bid opening to ensure that bidders have had sufficient time to consider the Addenda. A Bid which, in the opinion of the Owner, deviates significantly from the Contract Documents, and which has not been clarified through a written Addendum prior to Bid submittal deadline, shall be considered an exception to the Contract Documents and grounds for the Bid to be rejected. Bidders should read and understand all terms and conditions contained in these Contract Documents

Award

Water / Sewer

$3,976,004.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
134
Bidding Soon
2,411
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.