BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Mobile, Alabama. Completed plans call for the renovation of a residential development.

The City of Mobile's Department of Community and Housing Development (CHD) has opened the bidding process for 6808 N Greenway Dr. If you have any questions, you can call Ginny Kirby at 251-208-6297. Please make sure to accommodate homeowners and be considerate of their time and families as we are in the Holiday Season. Any complaints received will be considered and may result in a bid not being awarded to a particular contractor. Appointments are encouraged and preferred. If you are a new Contractor and are interested in bidding with our program, please contact Ginny Kirby at 251-208-6297. All Contractors must submit the required documentation to be registered in our program before any jobs can be awarded. Heating and Air Conditioning Replacement o Remove existing HVAC unit. o Install a new heating and air conditioning system. (Goodman, Nutone, or equivalent) gas and electric dual heat pump system. o The new unit shall be sufficient to properly heat and cool the entire house. o It shall be the contractor's responsibility to ensure that the new unit is properly sized. o New unit shall be high efficiency. Minimum of 14 seer. o Modify existing duct work to ensure proper operation of new unit. o Repair any damaged duct work. o Add any duct work necessary to ensure proper heating and cooling in all areas of house. o Upon completion of this scope of work all ductwork shall be insulated metal duct. Short runs of flexible duct may be used for connecting to supply registers and boots. o Ensure that all ductwork is well supported and properly strapped in place. o Ensure that return grille is working properly and of adequate size. o Replace all supply registers and return grill. o Clean any existing ductwork that will be re-used. o Insure attic is insulated to R-30 after all necessary repairs are done. o Homeowner shall be supplied with 12 additional filters and informed on the changing of filters and the frequency that they should be changed. o Install a new properly matched thermostat from a recognizable manufacturer. o A properly sized manufactured condensing unit pad must be used. o Existing pad may be re-used if it is not damaged and is of adequate size. o Pad must be level. o Contractor must educate Homeowner on proper operation and maintenance of new unit. o Manufacturer's consumer literature on the unit must be left with the Homeowner along with warranty information on the unit. o The contractor shall include all items necessary to ensure the proper operation of this unit. This includes all connections to the gas service, the electrical disconnect, and electrical service to the unit and venting to meet code. Electrical o Perform all electrical work per the local code and pay for all permits and fees. o Replace all defective switches, plugs, and plates and missing light fixtures with new ones as needed. o All surface mounted lights are to be wall switch activated and have globes or shades. o Replacement fixtures shall be 14" dome 2 bulb fixture minimum. o Check all existing wiring, repair as needed, tighten connections and fixtures that are loose and replace those that are faulty. o Install new wall switch activated ceiling fan light fixture in bedrooms. The new fixture shall have fan blade dimensions equal to or greater than those of existing fan. (Ceiling fan fixture is to be of Hampton Bay, Harbor Breeze, or equivalent brand.) o Install a hard-wired carbon monoxide detector in a central location. (A plug in detector that can be removed or unplugged is not acceptable.) o Install AC/DC tandem wired smoke detectors in a central location, one (1) in each sleeping room, on each additional story of the dwelling, including basements, but not including crawl spaces and uninhabitable attics. Plumbing Repair Contractor is to perform all plumbing work per local code, Pay for all permits and impact fees. All materials used shall be (PEX) or non ferrous metals and insulated properly. No plastics or CPVC accepted. o Repair / replace all water leaks and drains in utility room. All fixtures shall be in proper working order and all drains should be free from leaks and shall drain properly.

Post-Bid

Residential Subdivision

$25,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
38
Bidding Soon
498
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2024

February 5, 2024

img_map_placeholder

6808 Greenway Dr S, Mobile, AL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.