BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2025 at 8:00 PM

Updated May 9, 2025

Demolition, site work, renovation and addition to a municipal facility in Waverly, Iowa. Completed plans call for the renovation of a municipal facility; for the addition of a 11,800-square-foot, three-story above grade municipal facility; for site work for a municipal facility; and for the demolition of a municipal facility.

You are invited to submit qualifications for the Bremer County Courthouse Addition and Renovation - BP #2 415 E Bremer Ave Waverly, Iowa 50677. Miron Construction Co., Inc., is the Construction Manager for the Owner. The subcontractors and suppliers for all work will be contracted through Miron Construction Co., Inc. Bremer County Courthouse Addition and Renovation BP#2 is an 11,800 sqft, 3 story addition to the existing courthouse with renovations to the existing courthouse. The building is comprised of structural steel, concrete on metal deck floors, 3-hour firewall separation, CMU elevator and stair shaft. Exterior is comprised mostly of brick facade with metal soffits. o Contract 03.30 Building Cast-In-Place Concrete o Contract 04.00 Masonry o Contract 05.00 Steel Fabrication and Erection o Contract 06.02 General Trades - BP#2 o Contract 07.10 Waterproofing & Air Barrier o Contract 07.40 Metal Panels & Soffits o Contract 07.51 Roofing o Contract 08.33 Overhead Doors o Contract 08.40 Aluminum Windows, Entrances, and Glass/Glazing, o Contract 09.20 Gypsum Board Systems o Contract 09.30 Tile o Contract 09.50 Suspended Acoustical Ceiling and Acoustical Panels o Contract 09.65 Resilient Flooring, Base and Carpet o Contract 09.66 Epoxy Matrix Terrazzo o Contract 09.90 Painting and Wall Covering o Contract 21.00 Fire Suppression o Contract 22.00 Plumbing o Contract 23.02 HVAC o Contract 26.02 Electrical o Contract 31.02 Earthwork, Building and Selective Site Demolition - BP#2 o Contract 32.17 Site Concrete - BP#2 o Contract 32.92 Seeding and Landscaping - BP#2 o Contract 33.02 Site Utilities - BP#2 Work for this project is anticipated to begin in July of 2025 and be substantially complete in March of 2027. Qualifications shall be prepared exclusively on the form provided. Submitted qualifications are to be clearly labeled with "QUALIFICATIONS FOR THE BREMER COUNTY COURTHOUSE ADDITION AND RENOVATION BP#2."

Post-Bid

Municipal

$6,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
111
Bidding Soon
1,202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

July 1, 2025

Project location map

415 E Bremer Ave, Waverly, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.