BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2024 at 7:00 PM

Updated February 4, 2024

Site work and outdoor lighting for a road / highway in Somers Point, New Jersey. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Route 52 Causeway Accent Lighting Rehabilitation, Cities Of Somers Point, Atlantic County And Ocean City, Cape May County; 100% State Funded, PE No: 2622635, CE No: 2622899 INQUIRIES REGARDING THE PROJECT 2. After Award of Contract. Mr. John Longworth, Director New Jersey Department of Transportation 1035 Parkway Avenue Trenton, NJ 08625-0600 Phone: 609-963-1518 Estimated Completion Date on One (1) Year from NTP Contractors Prequalified in one of these Work Types are eligible to bid this project: 4, 4B, 5 or 7 Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d) Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on File With This Department. The Attention of Bidders is Directed to the Provisions Covering Subletting or Assigning the Contract. The Entire Work is to Be Completed on or Before the Estimated Completion Date Stated Above. DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33 NJDOT: 460 - Route 52 Causeway Accent Lighting Rehabilitation

Award

Roads / Highways

$2,964,220.00

Public - State/Provincial

Outdoor Lighting, Site Work

44

5

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
415
Active Projects
218
Bidding Soon
2,537
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2024

March 4, 2024

Project location map

NJ-52, Somers Point, NJ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.